Removal of existing flat roof covering. Removal of internal ceiling slabs. Repair of existing rotten flat roof rafters (assumed 20%). Treating of all rafters with chemical preservative (Protim Green E or Similar) Installation of 100mm PIR Insulation Board between rafters. Installation of Foil Backed Slab and Vapour Control Layer below rafters. Laying of new Firring Boards where necessary Laying of 18mm OSB-3 Deck Weather proofing with Fibre-Glass Membrane Cross Ventilation of rafters with ventilation strip at eaves and ventilation detail at wall abutment. Inspection & Repair of all flashings New PVC Soffit, Facia & Gutter.
Works
05/06/2020 17:00:00
44112400-2 Roof
44112500-3 Roofing materials
45260000-7 Roof works and other special trade construction works
45261210-9 Roof-covering work
45261410-1 Roof insulation work
45261420-4 Waterproofing work
45261910-6 Roof repair
Meelin National School
Meelin
Co.Cork
Meelin
Ireland
View profile
Tim Lenihan
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 07/05/2020 16:00 |