Electrical element of the Works. Main works consist of Demolition of a 3 storey rear extension (c. early-to-mid twentieth century) to the north of the NIB building, a 1 storey concrete building (c. 1970) to rear of NIB building and 2 no. out-buildings; Conservation and change of use of NIB building; Construction of a new 3 storey over basement building, linked to NIB building at ground and first floor level, with a partial plant storey at roof level; Provision of carparking, bicycle and motorcycle parking; Landscaping of the external forecourt forming part of the existing historic town square on Baileborough Main Street to include replacement accessibility ramp, set down area, and revised vehicular access arrangement; External works will comprise an additional vehicular access gate set back from the front elevation, new perimeter walls and new vehicular access gates to rear, perimeter fencing to side boundaries to rear of NIB building, bin store, fuel store and other ancillary structures and elements; Construction of new ESB substation; Provision of renewable energy equipment; Provision of CCTV cameras; New foul drainage, surface water drainage and all ancillary site services and works.
Works
26/05/2020 12:00:00
45310000-3 Electrical installation work
45311000-0 Electrical wiring and fitting work
45315100-9 Electrical engineering installation works
51110000-6 Installation services of electrical equipment
Office of Public Works (OPW)
Jonathan Swift Street
Co. Meath, C15 NX36
Trim
Ireland
View profile
Breda Flanagan
https://www.gov.ie/en/organisation/office-of-public-works/
Notice | Date of dispatch |
---|---|
Contract notice (TED (v209)) | 15/04/2020 16:10 |