2020 High School - Building Services (M&E) Engineering Services for Additional Accommodation at CBS High School, Clonmel

Building Services (M&£) Engineering Services for Additional Accommodation at CBS High School, Clonmel, comprising: • 2 SET rooms 15m2 each • 2 Science labs, 88.6m2 each • 1x Prep room 38.5m2 • 1 DCG room 88.6m2 • 1 Home Economics room 118.8m2 • 1 Textiles room 88.6m2 • 1 Multimedia room 88.6m2 ALSO: • 2 Classroom SEN Base 524.4 m2 Giving a Gross Floor Area (including circulation and partitions of 1454 m2 and also external areas: • Secure hard and soft play area 200 m2 • Sensory Garden 100m2 • 6 parking spaces

Services

17/04/2020 00:00:00

71334000-8  Mechanical and electrical engineering services
71300000-1  Engineering services
71314310-8  Heating engineering services for buildings
71318000-0  Advisory and consultative engineering services
71321000-4  Engineering design services for mechanical and electrical installations for buildings
71333000-1  Mechanical engineering services


CBS High School (Clonmel)
Kickham Street
Co.Tipperary
Clonmel
Ireland
View profile

Noel Merrick

Published notices
Contract notice (TED (v209)) 08/03/2020 12:10
Lots
Building Services (M&£) Engineering Services for Additional Accommodation at CBS High School, Clonmel
Additional information:
Documents Documents
Close