1.1 TAKING UP OF EXISTING CONCRETE/ TARMAC TO ALLOW FOR NEW ACCESS MANHOLES (APX 6 NO.) AND DISPOSE OF EXCAVATED MATERIAL, 1.2 REMOVAL OF EXISTING CORRODED TRUNK PIPE AND DISPOSE OF, 1.3 SUPPLY AND FIT OF APX 39M OF 38MM CAPLEX DUO, 1.4 CONNECTION OF EXISTING TEE’S TO NEW TRUNK PIPE 1.5 SUPPLY AND FIT D400 ACCESS MANHOLES, 1.6 CONNECTION TO EXISTING PIPEWORK ON EACH END OF NEW TRUNK PIPE, 1.7 MAKE GOOD ALL FINISHES.
Works
07/06/2019 16:00:00
45350000-5 Mechanical installations
45000000-7 Construction work
45200000-9 Works for complete or part construction and civil engineering work
45330000-9 Plumbing and sanitary works
45331000-6 Heating, ventilation and air-conditioning installation work
45331100-7 Central-heating installation work
45332000-3 Plumbing and drain-laying work
45332200-5 Water plumbing work
45332300-6 Drain-laying work
45351000-2 Mechanical engineering installation works
St. Louis Secondary School (Carrickmacross)
Carrickmacross
Co.Monaghan
Carrickmacross
Ireland
View profile
Kieran Reilly
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 10/05/2019 16:31 |