Proposed new trainee kitchen incorporating demolitions of existing high level heaters, lights and all associated pipework/cabling together with fire sealing of all existing blockwork walls, extending in height rear wall, construction of dry storage units and water storage room and other minor works, all drainage connections to existing services together with trenches for gas pipes to new appliances (by others); flooring, wall lining and new suspended ceiling; high level suspended steel frame for water tank; provision of new gas tank externally with underground piped supply to kitchen; all internal lighting, heating, ventilation and fire alarms. Existing site canteen extension incorporating new flooring, extension of wall lining and ceilings to match existing kitchen, relocation of roller shutter, provision of electrical/mechanical services to new appliances (by others) locations, connecting all new works into existing services on site (electrical/mechanical/civils/fire). The above is a non-exhaustive list and should be read in conjunction with all the attached tender documentations.
Works
23/01/2019 12:00:00
44115000-9 Building fittings
45212421-3 Restaurant construction work
45212422-0 Canteen construction work
45212423-7 Cafeteria construction work
45212500-1 Kitchen or restaurant conversion
45214000-0 Construction work for buildings relating to education and research
45214300-3 Construction work for college buildings
45214320-9 Technical college construction work
45214410-7 Polytechnic construction work
45214500-5 Construction work for buildings of further education
Tipperary Education & Training Board
Administrative Offices
Church Rd
Nenagh Co Tipperary
Ireland
View profile
Breda Cunneen
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 02/01/2019 13:00 |
| Contract Award Notice (eTenders) | 12/09/2019 13:30 |
Proposed new trainee kitchen incorporating demolitions of existing high level heaters, lights and all associated pipework/cabling together with fire sealing of all existing blockwork walls, extending in height rear wall, construction of dry storage units and water storage room and other minor works, all drainage connections to existing services together with trenches for gas pipes to new appliances (by others); flooring, wall lining and new suspended ceiling; high level suspend