The Morell River Flood Management Scheme (FMS) involves the construction of 7.5km of earthen embankment and 500m of reinforced concrete walls along the Morell River and its tributaries between Kill and Ballyhays in Co. Kildare (See Figure 1 below for location plan). The works are required to as part of a flood management scheme for the surrounding area and are programmed to be carried out over a period of 3 years. This document specifically relates to the haulage of embankment material from an existing construction site, also referred to as the Source Site, near Lucan, Co. Dublin to the site where the flood defence works are due to be constructed. The source of the embankment material is from a series of stockpiles which have been formed over a period of time to facilitate a large residential development as well as associated ancillary works as part of the ongoing Adamstown Strategic Development Zone (SDZ) works.
Supplies
13/07/2018 12:00:00
44100000-1 Construction materials and associated items
44110000-4 Construction materials
44113000-5 Road-construction materials
44140000-3 Products related to construction materials
44190000-8 Miscellaneous construction materials
44192000-2 Other miscellaneous construction materials
44420000-0 Goods used in construction
Office of Public Works (OPW)
Jonathan Swift Street
Co. Meath, C15 NX36
Trim
Ireland
View profile
Seán Fitzgerald
https://www.gov.ie/en/organisation/office-of-public-works/
| Notice | Date of dispatch |
|---|---|
| Contract notice (TED (v209)) | 11/06/2018 18:10 |
| Contract award notice (TED (v209)) | 14/02/2019 12:10 |