1. The Main Project: There is currently an artificial hockey pitch in situ which is not suitable for purpose and also has a lot of wear and tear. All of the sub-surface build up is in place and in good condition, including the drainage system, washed stone fill, pea gravel, porous tarmac layer and shock pad layer. The project consists of: removal and disposal of the existing grass carpet, wash the shock pad, repair the shock pad if damaged in any way during old carpet removal and refit new 3G carpet to the specification outlined. See attached tender documents for further details Other Works: Weld Mesh Fence: It is proposed to install a 1.23 meter high weld mesh fence inside the existing palisade fence for safety of the pitch users. This fence all round is 316 meters of Weld Mesh Post & Rail Fence. See details on General Scope of Works attached separately. See attached tender documents for further details Plinth Remedial Works: There is a protruding plinth on the inside of the existing palisade fence which needs to be removed for safety reasons. Just inside this protruding plinth there is a finished plinth flush with the artificial grass pitch which is fine. It involves removing a cavity block on top and then a 6” block on flat straight under and making good to flush with internal plinth. See details on General Scope of Works attached separately. See attached tender documents for further details
Works
06/07/2018 17:00:00
92000000-1 Recreational, cultural and sporting services
92600000-7 Sporting services
92610000-0 Sports facilities operation services
Cannon Hayes Community Recreation Centre Ltd
Cashel Road
Co.Tipperary
Tipperary Town
Ireland
View profile
John Ryan
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 06/06/2018 16:30 |
| Contract Award Notice (eTenders) | 05/02/2019 21:30 |
Support in Sport (International) Ltd, organisation no: IE3282010JH