The proposed works comprises of the extension to the existing RAP1 factory road at Pairc Gno Gaoth Dobhair, Na Doire Beaga, Co. Dhun na n-Gall. The works are to be carried out in a live production environment operating on 24/7 basis with constant requirements for deliveries and final product collection at all times. The client desires a side extension of floor area 576m² single storey to be completed in a 3 month timeframe with a rear extension to follow of area 483m².The internal upgrade works consists of Fire Regulation upgrade works in the existing offices and production area will be completed during off peak and holiday periods.
Works
16/05/2018 16:00:00
45262800-9 Building extension work
45000000-7 Construction work
45210000-2 Building construction work
45213100-4 Construction work for commercial buildings
Údarás Na Gaeltachta
Na Forbacha
Co. na Gaillimhe
Ireland
View profile
Breandán Breathnach
http://www.udaras.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 13/04/2018 17:00 |
Please see 'Instruction to Tenderers' document for further instructions.