Mayo County Council require Landscape & Visual Assessment Consultancy Services to assist in the progression of the design of the N59 Westport to Mulranny Road Project through Phase 3 & 4 of the NRA 2010 Project Management Guidelines. The Consultant shall assess the Preferred Route in relation to Landscape & Visual Assessment issues, prepare the Lanscape & Visual Assessment sections for the Environmental Assessment Report, assist the Design Team in preparation for the statutory procedures, oral hearings, judicial reviews where necessary.The services required for the above duties may include :*Prepare Landscape & Visual Assessment Reports for inclusion in the Design (Preliminary Design) Report and EIA/Part 8 Statutory Procedures in accordance with NRPMG 2010.*Preparation of Risk Assessments and Cost Estimates in accordance with the Cost Management Manual*Preparation for and attendance at Risk Workshops, Value Engineering Workshop, Peer Review, Oral Hearings, etc, including giving evidence at Oral Hearings.*Consultation with statutory and non-statutory bodies*Liaison with the Design Team including other environmental and technical specialists*Preparation of drawings/mapping for inclusion in the above reports/ processes*Preparation for and participation in the Design Meetings*Preparation of documents suitable for inclusion in the Preliminary Design Report, Environmental Assessment Report, Part 8 Planning Submission*Preparation of general arrangement drawings for inclusion in the above reports/processes* Interaction and consideration of other environmental topics/specialists* Carry out all baseline data collection
Works
05/08/2011 00:00:00
Mayo County Council
Áras an Chontae
Castlebar
Co. Mayo
Ireland
View profile
Irish Buyer
| Notice | Date of dispatch |
|---|---|
| Contract Award Notice (eTenders) | 15/08/2011 00:00 |
Mayo County Council require Landscape & Visual Assessment Consultancy Services to assist in the progression of the design of the N59 Westport to Mulranny Road Project through Phase 3 & 4 of the NRA 2010 Project Management Guidelines. The Consultant shall assess the Preferred Route in relation to Landscape & Visual Assessment issues, prepare the Lanscape & Visual Assessment sections for the Environmental Assessment Report, assist the Design Team in preparation for the statutory procedures, oral