The scope of the Mechanical works shall consist of in summary: • Full LPHW heating installation fed from central plant consisting of condensing gas fired boilers and heat pumps and gas fired CHP. • A domestic water services installation. The domestic hot water heater cold feed shall be pre-heated by the roof mounted air source heat pumps via the heat pump buffer vessel prior to delivery to the hot water storage vessel. • Mechanical ventilation installation • Above ground soils and waste installation. • Fit out of a new plantroom including boilers, CHP unit, buffer and storage vessels, pumps, TMVs, control and safety devices. • Mechanical plant control panel incorporating BMS panel. • Site services natural gas services. • Supply and installation of fire-fighting equipment. • Provision of Operating and Maintenance manuals and presentation of mechanical systems to client at series of client handover seminars.
Works
29/03/2019 16:00:00
45000000-7 Construction work
45210000-2 Building construction work
45212212-5 Construction work for swimming pool
South Dublin County Council
County Hall
Tallaght
Dublin 24
Ireland
View profile
Sandra Moran
http://www.sdcc.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 21/02/2018 16:00 |
| Contract Award Notice (eTenders) | 05/09/2019 15:30 |
Tenders must be submitted online via the electronic postbox on www.etenders.gov.ie before 4pm on the 29th of March 2019.
Walsh Mechanical Engineering Ltd, organisation no: IE4701897U