Block B Ventilation Pilot Study - Block B Ventilation Pilot Study

Addition of ductwork, grilles, passive return air ductwork, removal of existing AHU and replacing with a new energy efficient AHU • Install supply air ductwork and grilles to 3no, classrooms within Block B as part of a pilot study. • Install passive exhaust ductwork, grilles and attenuators in the 3no. classrooms. • Strip out and removal from site of existing AHU mounted on the roof. • Supply and installation of new AHU in same location as existing. • Modifications of existing LTHW pipework on roof. • Associated Controls System. • Associated Electrical Services.

Works

23/08/2017 12:00:00

39563530-0  Ventilation ducting
42520000-7  Ventilation equipment
45331210-1  Ventilation installation work
45350000-5  Mechanical installations
45351000-2  Mechanical engineering installation works


Munster Technological University
Rossa Avenue
Bishopstown
Cork
Ireland
View profile

Catherine Cunningham
http://www.mtu.ie

Published notices
Contract Notice (eTenders) 27/07/2017 15:30
Contract Award Notice (eTenders) 03/05/2018 10:00
Lots
Block B Ventilation Pilot Study
Awarded supplier:

Integral Mechanical Services Contracting Ltd, organisation no: ie9699269D

Additional information:
Documents Documents