Addition of ductwork, grilles, passive return air ductwork, removal of existing AHU and replacing with a new energy efficient AHU • Install supply air ductwork and grilles to 3no, classrooms within Block B as part of a pilot study. • Install passive exhaust ductwork, grilles and attenuators in the 3no. classrooms. • Strip out and removal from site of existing AHU mounted on the roof. • Supply and installation of new AHU in same location as existing. • Modifications of existing LTHW pipework on roof. • Associated Controls System. • Associated Electrical Services.
Works
23/08/2017 12:00:00
39563530-0 Ventilation ducting
42520000-7 Ventilation equipment
45331210-1 Ventilation installation work
45350000-5 Mechanical installations
45351000-2 Mechanical engineering installation works
Munster Technological University
Rossa Avenue
Bishopstown
Cork
Ireland
View profile
Catherine Cunningham
http://www.mtu.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 27/07/2017 15:30 |
| Contract Award Notice (eTenders) | 03/05/2018 10:00 |
Integral Mechanical Services Contracting Ltd, organisation no: ie9699269D