Donegal Countywide Watermains Rehabilitation Project – Main Works Contract includes the following elements: • Contractor design & construction of approximately 43km of new watermains at the following locations throughout County Donegal: o Ballybofey-South Back Line, 9.3km o Derrybeg to Brinnaleck, 4.7km o Doaghmore, Fanad, 4.4km o Three Trees, Quigleys Point,3.4km o Meenaleck to Ranafast, 3.2km o Carlin, Kerrykeel, 2.4km o Argery to Rossgier, 2.0km o Cabry, Redcastle, 1.6km o Sheskinbeg, 1.4km o Finner-Dunmuckrum, 3.9km o Corker, 4.2km o Bundoran West End, 1.3km o Ballyshannon Town (backyard services), 0.6km o Abbeylands, 1.0km • The watermains will range in diameter from 50mm OD to 250mm OD; • The transfer of existing connections to the new mains where necessary; • Works will take place across and in close proximity to protected structures at several locations; • Works will take place in proximity to Special Areas of Conservation and Special Protection Areas; • Contaminated land may be encountered during the works; • Invasive species have been identified at some of the works locations • Heavy traffic conditions are expected at some of the proposed works locations; • The works will involve crossings of existing rivers and streams
Works
11/01/2017 12:00:00
44161200-8 Water mains
44161000-6 Pipelines
45231100-6 General construction work for pipelines
45231300-8 Construction work for water and sewage pipelines
45232100-3 Ancillary works for water pipelines
45232150-8 Works related to water-distribution pipelines
Uisce Éireann
Tender Administration, PO Box 900, Webworks, Eglinton Street,
Co.Cork
Cork
Ireland
View profile
Tender Admin
https://www.water.ie/
| Notice | Date of dispatch |
|---|---|
| Contract notice - utilities (TED (v209)) | 25/10/2016 11:40 |
Corrigendum (TED (v209))
|
04/11/2016 13:10 |
| Contract award notice - utilities (TED (v209)) | 19/09/2018 17:10 |
The works involve the replacement of 43km of watermains across 14 locations in County Donegal, which have been identified as priority sections for investment. It is intended that the works will be implemented under Irish Water’s Major Works Civil Engineering Contract
Documents are available to all candidates who register their interest through etenders. All queries for clarification must be submitted via email to tenders@ervia.ie The questionnaire must be completed and returned to the address detailed in the attached document no later than 12:00hrs Wednesday 11th January 2017.