Scoil Raifteiri Castlebar SWS 16 - Natural Gas Fired Boiler House Installation and Associated Works –Summer Works Scheme 2016

• De-commissioning and removal of existing oil storage tank and the existing oil fired boilerhouse installation. • Provide new floor mounted condensing natural gas fired boiler plant including new stainless steel flue, low loss flow and return headers, air and dirt separators, circulating pumps, isolation and control valves, pipework and pipework insulation • Natural gas supply to the boilerhouse including gas safety detection / isolation system • All associated electrical works to be provided • All associated builders attendances to be provided

Works

30/06/2016 16:00:00

42160000-8  Boiler installations
45000000-7  Construction work
45300000-0  Building installation work
45330000-9  Plumbing and sanitary works
45331000-6  Heating, ventilation and air-conditioning installation work
45331100-7  Central-heating installation work
45331110-0  Boiler installation work


Scoil Raifteiri
Fairgreen
Co.Mayo
Castlebar
Ireland
View profile

John Carr

Published notices
Contract Notice (eTenders) 16/06/2016 16:30
Lots
Natural Gas Fired Boilerhouse Installation & Associated Works –SWS 2016

Natural Gas Fired Boiler House Installation and Associated Works

Instructions to bidder:

Tenderers are required to read the DoES Suitability Declaration for Small Works carefully and to make sure that they meet the minimum standards stated therein. Tenderers who do not meet those requirements should not submit a tender as they will be excluded at award stage. All tenderers are liable for their own cost of tendering.

Additional information:
Documents Documents
RFT mailing address:
Heavey Kenny Associates,
Blake House, Kirwans Lane,
Galway
Ireland
Close