CHI Island Key - Remediation of preservative treatment to Timber Cladding for 2 Apartment Blocks at Island Key Apartments, East Wall, Dublin 3

The RFT has ended, you cannot answer the invitation.

The site is located at Island Key Apartments, East Wall, Dublin 3. The Site consists of 6 blocks, only two of which will be considered in this scope, namely, Block 4 and Block 5. Block 4 is divided into the End Block, Middle Block and Tower Block. Block 5 consists of Duplex units within 6 smaller, almost identical, blocks. All units are fully occupied serving mainly as residential units, with a few of the units consisting of businesses. The project will consist of the treatment of all external timber cladding to Block 4 and Block 5, treatment of windows/doors in the Tower Block and all of the Duplex units, localised repair to damaged cladding boards at Block 4 and Block5.

Works

07/04/2023 13:00:00

44212381-3  Cladding
45262650-2  Cladding works
45442100-8  Painting work
45442110-1  Painting work of buildings
45442120-4  Painting and protective-coating work of structures
45442121-1  Painting work of structures
45442180-2  Repainting work


Co-operative Housing Ireland
11/12 Warrington Place
D02 E221
Dublin 2
Ireland
View profile

Niall Kelly
http://www.cooperativehousing.ie

Published notices
Contract Notice (eTenders) 17/03/2023 09:00
Lots
Remediation of preservative treatment to Timber Cladding for 2 Apartment Blocks at Island Key Apartments, East Wall, Dublin 3
Additional information:
Documents Documents
Close