16/080 - Lough Mask Regional Water Supply Scheme, Water Treatment Plant Upgrade

The RFT has ended, you cannot answer the invitation.

Irish Water is currently advancing the Lough Mask Regional Water Supply Scheme – Water Treatment Plant Upgrade Design Build Operate Contract comprising the upgrade and expansion of the existing raw water intake works and water treatment plant to achieve a treated water output of 54,000m3/day. The existing water treatment plant is capable of a treated water output of 38,000m³/day. The works required under the contract are to be delivered on a Contractor Design- Build-Operate basis. The DBO contract is approx. 18 months Design and Build including a process proving period and with a 1 year Operation and Maintenance period. The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.

Works

07/07/2016 12:00:00

45252126-7  Drinking-water treatment plant construction work
45232152-2  Pumping station construction work
45240000-1  Construction work for water projects
45247270-3  Reservoir construction works
45252140-1  Sludge-dewatering plant construction work
45315100-9  Electrical engineering installation works
45351000-2  Mechanical engineering installation works
65120000-0  Operation of a water-purification plant


Uisce Éireann
Tender Administration, PO Box 900, Webworks, Eglinton Street,
Co.Cork
Cork
Ireland
View profile

Tender Admin
https://www.water.ie/

Published notices
Contract notice - utilities (TED (v209)) 17/05/2016 17:10
    Corrigendum (TED (v209)) 21/06/2016 11:55
Lots
Lough Mask Regional Water Supply Scheme, Water Treatment Plant Upgrade

Irish Water is currently advancing the Lough Mask Regional Water Supply Scheme – Water Treatment Plant Upgrade Design Build Operate Contract comprising the upgrade and expansion of the existing raw water intake works and water treatment plant to achieve a treated water output of 54,000m3/day. The existing water treatment plant is capable of a treated water output of 38,000m³/day.

Instructions to bidder:

All queries for clarification must be submitted via email for the attention of The Shared Services Procurement Manager to Tenders@ervia.ie . The questionnaire must be completed and returned to the address in I.1. above not later than 12.00hrs Thursday 23rd June 2016. Please include the tender reference in all communications.

Additional information:
Documents Documents
RFT mailing address:
tenders@ervia.ie
Ireland
Close