This contract is for the deinstallation of the existing fan coil units followed by supply, installation, testing and commissioning of new units. All associated ancillary works to allow for these works shall be included. The Mechanical works Contractor shall act as the Main Contractor and shall act as PSCS. The works are to be carried out on a phased basis in an existing occupied office building. The building will, in general, be occupied for the duration of the works during normal working hours. The Contractor shall be given possession of areas that suit the functional requirements of the occupants in line with the programme.The building comprises 4 floors and consists of an area of approx 7,600 sqm.The extent of works are as follows:Strip out of existing air conditioning fan coil units, grilles, ductwork and pipework and replace with new.All ancillary works such as ceiling replacement, associated builders attendances and electrical works shall form part of the works.
Works
14/11/2014 12:00:00
50710000-5 Repair and maintenance services of electrical and mechanical building installations
50712000-9 Repair and maintenance services of mechanical building installations
71315000-9 Building services
Office of Public Works (OPW)
Jonathan Swift Street
Co. Meath, C15 NX36
Trim
Ireland
View profile
Ben Malone
https://www.gov.ie/en/organisation/office-of-public-works/
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 19/09/2014 15:40 |
Office Block, Cork, Air Conditioning Upgrade Works. This contract is for the deinstallation of the existing fan coil units followed by supply, installation, testing and commissioning of new units. All associated ancillary works to allow for these works shall be included.