Kevin Street Garda Divisional HQ - Phase 2 - Main Contractor Prequalification

The RFT has ended, you cannot answer the invitation.

Scope of the proposed work comprises a New Garda Divisional Headquarters (Phase 2) which will be adjacent to the existing Kevin Street Garda station, which is a Protected Structure (formerly called St. Sepulchre's Palace). This project is a two phase development, the first phase of which is now complete. This second phase of the works will consist of the construction of a new 6,840sqm Garda Divisional Headquarters building with a 5,400sqm double basement. The development consists of a 2-3 storey building with flat roofs along the west boundary; a 5 storey building with flat roof and curved street elevation along the east boundary and a connecting glazed atrium with a mono-pitch glass roof. The accommodation includes offices, conference facilities, vehicular testing, garage/workshops, stores, public reception, prisoner processing areas, plant, ESB sub-station, landscaped roof terrace and associated ancillary spaces. A public pedestrian entrance is proposed at the corner of Kevin Street and Bride Street

Works

02/07/2014 12:00:00

45210000-2  Building construction work
45216000-4  Construction work for buildings relating to law and order or emergency services and for military buildings
45216100-5  Construction work for buildings relating to law and order or emergency services
45216110-8  Construction work for buildings relating to law and order
45216111-5  Police station construction work
45313000-4  Lift and escalator installation work
45313100-5  Lift installation work
45315000-8  Electrical installation work of heating and other electrical building-equipment
45315100-9  Electrical engineering installation works
45351000-2  Mechanical engineering installation works


Office of Public Works (OPW)
Jonathan Swift Street
Co. Meath, C15 NX36
Trim
Ireland
View profile

Helena Fagan
https://www.gov.ie/en/organisation/office-of-public-works/

Published notices
Contract Notice (eTenders) 29/05/2014 17:40
Contract Notice (TED (2.0.7 old not supported version)) 29/05/2014 17:40
Contract Award Notice (eTenders) 03/02/2015 16:10
Contract Award Notice (TED (2.0.7 old not supported version)) 03/02/2015 15:40
Lots
Kevin Street Garda Divisional HQ - Phase 2 - Main Contractor Prequalification
Additional information:
Documents Documents
Close View notice