Iarnród Éireann are proposing to set up a framework for the provision of structural engineering steel fabrication services as outlined below. Iarnrod Eireann will provide all details in relation to survey reports, specifications, drawings, sketches, photographs and other information required to the steel fabrication specialist for the production and submission of fabrication shop drawings, details, and layouts as required, and the manufacture, supply, delivery and installation of fabricated steelworks, elements and systems on-site. The fabrication specialist will be required to attend site and work on-site. This Framework Agreement will operate for a period of 3 years with the option to extend for an additional year. This is a 2 Stage Process with all required information available on the attached Pre Qualification Questionnaire ( PQQ) The PQQ should be downloaded and reviewed. Interested parties must then complete and return . All required information is on the PQQ.
Works
03/06/2014 12:00:00
45223210-1 Structural steelworks
45255400-3 Fabrication work
45262420-1 Structural steel erection work for structures
45262423-2 Deck-fabrication work
Iarnród Eireann-Irish Rail
Connolly Station,
Dublin
Dublin
Ireland
View profile
Martin Egan
http://www.irishrail.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 02/05/2014 12:10 |
| Contract Notice - Utilities (TED (2.0.7 old not supported version)) | 02/05/2014 12:10 |