Works contractor to undertake the construction of flood defence works in Skibbereen town and environs. The proposed works include: - Construction of approximately 2,200lin.m of reinforced concrete flood defence wall (masonry faced in locations) - Construction of a reinforced concrete river channel (5m width approx) over approx. 340lin.m - Construction of approximately 4,200lin.m of flood defence embankments - Installation of approximately 6,000lin.m of sheet piling, to various depths - Construction of 4 no. culvert structures and associated works - Road regrading and associated works over approx 200lin.m - Construction of 25lin.m of glass floodwalls - Construction of storm water drainage works, including pumping stations. - River bed regrading works
Works
28/03/2014 16:00:00
45246000-3 River regulation and flood control works
45246400-7 Flood-prevention works
45246410-0 Flood-defences maintenance works
Cork County Council
County Hall
Carrigrohane Road
Cork
Ireland
View profile
Joan Dineen
| Notice | Date of dispatch |
|---|---|
| Contract Notice (TED (2.0.7 old not supported version)) | 22/02/2014 09:00 |
Notice for Additional information (TED (2.0.7 old not supported version))
|
22/02/2014 09:00 |
Construction of flood defence works in Skibbereen town and environs. The proposed works include construction of reinforced concrete flood defence wall (masonry faced in locations), reinforced concrete river channel, flood defence embankments, installation of sheet piling, to various depths, culvert structures and associated works, road regrading and associated works, glass floodwalls, storm water drainage works, including pumping stations and river bed regrading works.