The redevelopment of Londonderry Park in Newtownards looks to develop the existing sports facilities found within the existing parkland. The proposed siteworks includes a new vehicular access to the parkland from the Portaferry Road, new internal vehicular access roads leading to a new car park with an approximate capacity of 150nr cars, site-wide pedestrian paths and runnings trails, 2nr new 3G synthetic football pitches with associated floodlights/fencing, 1nr new sand- dressed synthetic hockey pitch with associated floodlights/fencing and re-landscaping of informal grass areas. The proposed building works include the demolition of 2nr existing changing pavilions to allow the construction of a new purpose-built sports pavilion, the construction of a new toilet facility adjacent to the existing play park area and a new cricket storage pavilion with 2nr adjoining cricket batting practise nets. The sports pavilion will contain 14nr changing rooms, social facilities, staff offices/areas and associated ancillary accommodation with a proposed floor area of approximately 2000sqm. The construction of the proposed buildings and siteworks is anticipated to be completed by June 2015.
Works
25/02/2014 17:00:00
45111100-9 Demolition work
45113000-2 Siteworks
45212100-7 Construction work of leisure facilities
45212220-4 Multi-purpose sports facilities construction work
45212230-7 Installation of changing rooms
45212600-2 Pavilion construction work
45310000-3 Electrical installation work
45316100-6 Installation of outdoor illumination equipment
45342000-6 Erection of fencing
45351000-2 Mechanical engineering installation works
45400000-1 Building completion work
Ards Borough Council
2 Church Street
Co.Down
Newtownards
Ireland
View profile
Jonny Cassidy
Notice | Date of dispatch |
---|---|
Contract Notice (eTenders) | 24/01/2014 17:00 |
Contract Notice (TED (2.0.7 old not supported version)) | 24/01/2014 17:00 |