Roof Reurbishment Works - Roof Refurbishment Works to St.Columba's Girls' National School, Douglas, Co. Cork

The RFT has ended, you cannot answer the invitation.

Works consist of the refurbishment of the existing flat roof of St.Columba's Girls' National School involving the cleaning and priming of the existing mastic asphalt roof and the supply and laying of new torch on underlay and waterproofing layer along with with associated dressing, weathering and drainage connection works.

Works

10/01/2014 12:00:00

45000000-7  Construction work
45200000-9  Works for complete or part construction and civil engineering work
45220000-5  Engineering works and construction works
45260000-7  Roof works and other special trade construction works
45261000-4  Erection and related works of roof frames and coverings
45261200-6  Roof-covering and roof-painting work
45261210-9  Roof-covering work
45261214-7  Bituminous roof-covering work
45261300-7  Flashing and guttering work
45261310-0  Flashing work
45261320-3  Guttering work
45261400-8  Sheeting work
45261410-1  Roof insulation work
45261420-4  Waterproofing work
45261900-3  Roof repair and maintenance work
45261910-6  Roof repair
45262000-1  Special trade construction works other than roof works
45262100-2  Scaffolding work


St. Columba's G.N.S. with Facility for Deaf Children
Douglas Village
Co. Cork
Douglas
Ireland
View profile

Stephen O'Grady

Published notices
Contract Notice (eTenders) 10/12/2013 17:00
Lots
Roof Refurbishment Works to St.Columba's Girls' National School, Douglas, Co. Cork

The works consist of the resurfacing of the existing flat roof at the above involving cleaning and priming of the existing roof and supply and laying of a new underlay and waterproofing capping sheet along with all necessary lapping and dressing to upstands, rainwater outlets and rooflights and all associated preparation works. The contractor is to ensure that the new roof surface will have a 20 year guarantee.

Instructions to bidder:

The existing roof area equates to approximately 1435 square meters. The contract period will be from the start of February until the end of March 2014. The Contractor shall ensure that the tenders are priced as per the Outline Schedule of Works attached with the Tender Price submitted on the FTS6 Short Public Works Contract attached.

Additional information:
Documents Documents
RFT mailing address:
Denis O' Sullivan & Associates
Joyce House, Barrack Square
Ballincollig, Co. Cork
Ireland
Close