Invitation to Tender
|
To: |
All Applicants interested in tendering for the Construction Contract described below. |
|
Regarding: |
Sligo Water Conservation Project, Sligo City Watermains Replacement Works - Contract No. 4 |
|
Date |
10/09/2013 |
A Dhaoine Uaisle
This Contract is for the construction, testing and commissioning in accordance with the Works Requirements. The extent of the Works to be constructed and commissioned by the Contractor include but are not necessarily limited to the following:
|
Watermain Rehabilitation Works
355mm OD PE 100 SDR 17 polyethylene pipe 1710m 355mm OD PE 100 SDR 17 polyethylene pipe (barrier) 105m 280mm OD PE 100 SDR 17 polyethylene pipe 910m 225mm OD PE 100 SDR 17 polyethylene pipe 630m 180mm OD PE 100 SDR 11 polyethylene pipe 1607m 180mm OD PE 100 SDR 11 polyethylene pipe (barrier) 126m 180mm OD PE 100 SDR 17 polyethylene pipe 3950m 180mm OD PE 100 SDR 17 polyethylene pipe (barrier) 270m 125mm OD PE 100 SDR 17 polyethylene pipe 45m 20/32mm nominal outside diameter PE 100 polyethylene pipe 3832m Consumer Connections 663 No. |
|
|
Sewers
900mm diameter concrete sewer 47m 900mm diameter ductile iron sewer 43m 750mm diameter concrete sewer 475m 600mm diameter concrete sewer 245m 450mm diameter concrete sewer 460m 375mm diameter concrete sewer 249m 225mm diameter sewer 14m 160mm uPVC pipe 1,127m 110mm uPVC pipe 543m Gullies 104 No. Consumer connections to new sewers 40 No. Rehabilitation of existing consumer connections 50 No.
|
|
Ancillary Works include:
Trial hole excavation and reinstatement to locate and confirm design of pipelaying works;
Demolition of the existing culverts, sewers and manholes;
Construction of petrol interceptor and surface water outfall;
Installation and decommissioning of ridermains on both sides of the road (as applicable) to maintain a continuous supply of potable water to consumers;
Over pumping of sewers where necessary to maintain a live sewerage system;
Service connections including installation of boundary box at the outer edge of the property boundary;
Pipeline and PE welded joints testing;
Temporary and permanent reinstatement;
Connections to existing ‘live’ distribution/ collection systems;
Commissioning works include facilitating full change over to new works and decommissioning of existing works;
Temporary traffic management;
River/stream crossings;
Ecological screening, preparation of impact assessments, development of mitigation measures, design and detailing of protection works and monitoring;
Archaeological screening, preparation of impact assessments, development of mitigation measures, design and detailing of protection works and monitoring;
Water quality testing
Trench Dewatering
Auditing of personnel, equipment and techniques for PE welding
Provision of accommodation for Employer’s Representative
Disposal of waste materials; and
Other works included in the Contractor’s Works Proposals
You are invited to submit a Tender for the above Contract complying with the enclosed Instruction to Tenderers.
Is mise, le meas,
Signed _Tom Kilfeather_________
On behalf of Sligo County Council