The purpose of this commission is to have in place an updated airfield Masterplan that takes account of changed economic circumstances, but which also addresses new business requirements. It will enable DAA to move forward with opportunities in a coherent manner, independent of the delivery of a parallel runway where possible. It will provide a clear route forward and assist in avoiding nugatory spend. The output of the updated Masterplan will form a key input to the next CIP and will assist in demonstrating a clear vision and implementation strategy.
Services
30/07/2013 15:00:00
71000000-8 Architectural, construction, engineering and inspection services
71200000-0 Architectural and related services
71210000-3 Advisory architectural services
71220000-6 Architectural design services
71222000-0 Architectural services for outdoor areas
71240000-2 Architectural, engineering and planning services
71250000-5 Architectural, engineering and surveying services
71300000-1 Engineering services
71310000-4 Consultative engineering and construction services
71311240-5 Airport engineering services
71313000-5 Environmental engineering consultancy services
71320000-7 Engineering design services
71336000-2 Engineering support services
71400000-2 Urban planning and landscape architectural services
71410000-5 Urban planning services
daa plc
Dublin Airport
Co Dublin
Dublin
Ireland
View profile
Paul O Connor
http://www.daa.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 29/06/2013 00:00 |
| Contract Notice - Utilities (TED (2.0.7 old not supported version)) | 29/06/2013 00:00 |