To whom it may concern,
Sligo Leitrim Energy Agency clg (Sligo SEC) is issuing a request for tender to investigate the availability of sustainable feed stocks and potential Anaerobic Digestion (AD) plant locations in the North West to supply a Satellite Gas Network in Sligo Town.
Sligo Leitrim Energy Agency clg requires a competent engineering consultancy to produce a feasibility report that will inform the provision of a marketplace for locally generated biomethane (approx. 50 GWh) by carrying out a detailed analysis of the available sustainable feedstock, potential AD plant locations, engaging relevant stakeholders and supporting the Sligo Local Gas Network project.
The study will be required to outline a detailed regulatory, technical and commercial analysis of the proposed solution including risk assessment considerations and outline the key factors for successful project development.
The study will be required to inform financial decisions to assist Sligo Leitrim Energy Agency clg in formulating enquiries to technology suppliers in identifying the phases and specification of the technology.