The development will comprise the construction of a new build, stand-alone,500m2 detached two-storey building to include a shared incubator community-based kitchen with hospitality, tuition space, demonstration kitchen together with ancillary food preparation and storage, toilet and changing facilities within the building. Works to include supply and installation of catering equipment as outlined in the tender specification documents. Reconfiguration to the existing car park to the rear of the former St Paul’s Church. The two-storey building will include rooftop machinery and plant with photovoltaic panels. The grounds of the former graveyard to the west of the building shall be landscaped and planted with raised flower beds and grass areas with bench seating. Connections are required to existing drainage, foul water, potable water, and utility services located to the north of the building. No works or alterations are proposed to the former St Paul’s Church which is a Recorded Monument (DU018-020414) and Protected Structure and lies within a Zone of Archaeological Interest.
Works
03/05/2022 17:30:00
45000000-7 Construction work
45200000-9 Works for complete or part construction and civil engineering work
45210000-2 Building construction work
45212420-6 Construction work for restaurants and similar facilities
45213100-4 Construction work for commercial buildings
45214300-3 Construction work for college buildings
SPADE Enterprise Centre
St Pauls’ Area Development, North King Street
Co.Dublin
Dublin 7
Ireland
View profile
Simon Shiels
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 18/02/2022 20:00 |