WWETB Kilnamanagh CNS 2123 - Kilnamanagh CNS Heating Upgrade Emergency Works

The RFT has ended, you cannot answer the invitation.

The scope of the works for Kilnamanagh Community National School Heating Upgrade Emergency Works Project includes the following: a) De-commissioning, Isolation, drain down, removal and disposal of the redundant boiler and heating distribution system, DHW Calorifier, oil storage tank and associated services to a licenced waste / recycling facility. b) Convert the heating system fuel supply to LPG as the fuel source, construction of a new gas tank storage compound and connection of the new gas service to the boiler room. c) Supply and installation of a new gas fired boiler, flue system and gas safety systems d) Replacement of the boiler room pipe work, valves, actuators, pumps and controls etc with new services to suit the new boiler room layout e) New packaged pressurisation unit and expansion vessel and associated controls f) New boiler room control panel and controls g) New DHW Calorifier and associated pipework and controls h) New heating distribution pipework and radiator systems to replace all of the original radiators with new distribution system i) Controls upgrade to provide new two port motorised valves and room thermostats to individual classrooms, circulation areas and offices to provide independent local control. j) Electrical works associated with the upgrade of the heating system and controls. k) Testing & commissioning of the upgraded heating and gas services. l) All builders work and redecoration associated with mechanical upgrade including protection of existing school finishes from damage during the upgrade works. m) Full contract clean and sanitising of the entire school building prior to handover. n) Maintenance during the 12 months defects period. The Mechanical Contractor shall supply all labour, materials, equipment and engineering services, and perform all works necessary to install the complete, tested, commissioned, and operational mechanical systems in accordance with the Specification and Drawings.

Works

12/10/2021 16:00:00

45214200-2  Construction work for school buildings
45214210-5  Primary school construction work
45232141-2  Heating works
45331000-6  Heating, ventilation and air-conditioning installation work
45331100-7  Central-heating installation work
45350000-5  Mechanical installations


Waterford & Wexford Education & Training Board
WWETB Head Office, Ardcavan Business Park
Co.Wexford
Ardcavan
Ireland
View profile

John Fahey
http://waterfordwexford.etb.ie/

Published notices
Contract Notice (eTenders) 28/09/2021 15:30
Lots
Kilnamanagh CNS Heating Upgrade
Additional information: