Phase 1b Supply, Installation & Commissioning of a Backup Generator associated with the Medium Voltage / Low Voltage Upgrade at Mayo University Hospital. This works shall include the supply, delivery to site, placing in position, assembly and installation, connection, testing, commissioning and maintenance for a guarantee period of one year from acceptance by the Employer, of a standby generator, rated at 2,00₩ KVA standby power. The generator shall be designed to accept minimum of 75% single block load and operate within limits described in ISO 8528-5, Performance Class Operating Limit Values, Table 4, Class G2. The system shall consist of: Diesel alternator set (at 0.8 p.f.) 400/230V AC in an enclosure, Digital control panel, Starting batteries and charger, Exhaust and silencing system, Control/pilot cables, Sound attenuation & associated ductwork, Enclosure, All pipework & associated pumps and filtering systems, Flue System, EGIP synchronisation to ESB network, Anti-vibration mountings for the diesel alternator set, Earthing, Ventilation, Integration and upgrade of existing Hospitsl SCADA system ( eX700 series), EGIP synchronisation, All necessary sundries to give a complete and satisfactory emergency/stand-by electrical generation and distribution system, Service manuals and record drawings, Tools and spare parts, Temporary Fuel storage system, Load banks and connecting cables, Fuel for testing and commissioning including 48 hour, full load operation of the generator. The installation of the back-up generator and associated fuel tank shall be co-ordinated with the Building & Civil Works Contractor whom is being procured separately.
Works
09/09/2021 12:00:00
31120000-3 Generators
31122000-7 Generator units
31127000-2 Emergency generator
45310000-3 Electrical installation work
Health Service Executive (HSE)
Head Office
Millennium Park
Naas
Ireland
View profile
Liam Flannery
http://www.hse.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 29/07/2021 18:30 |