The Project is located at two sites. Works on site 1 on the N21 at Tooreenmore, Knocknagoshel will involve the import and placement of fill material to regrade an existing fill slope. Excavation of an interceptor drain at the foot of the slope will also be required. Site 2 is located on the N67 at Tarbert Pier, this project involves the removal of an existing Vehicle Restraint System and replacement with a containment kerb and pedestrian railing arrangement. Improved access to existing footpaths and drainage works are also proposed.
Works
09/07/2021 16:00:00
45233120-6 Road construction works
34928300-1 Safety barriers
45200000-9 Works for complete or part construction and civil engineering work
Kerry County Council
County Buildings, Rathass
Co Kerry
Tralee
Ireland
View profile
Donal O'Connell
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 17/06/2021 18:00 |
| Contract Award Notice (eTenders) | 24/01/2022 09:38 |
The works at site 1 involve re-profiling of an existing sideslope within a recently widened road boundary through importation, placement and compaction of fill material to proposed levels to address a road safety issue. The works at site 2 involve the removal of an existing timber clad steel vehicle restraint system and replacement with a bespoke arrangement, comprising of a containment kerb and a steel pedestrian guardrail anchored to a reinforced concrete foundation and stub wall.