The Tullaher Group Water Scheme watermains rehabilitation works consist of upgrade works to an existing group water scheme located at Tullaher, Co. Clare. The upgrade works will consist of the removal of 4.5 k.m. of the existing mains and the replacement of same with a new 100mm HDPE watermain to the specified group water scheme area, including in the installation a booster pump on the existing main, east of the connection point. The nature of the works includes removal of the existing watermain, laying the new watermain, connection to the existing main, provision of bulk meter, booster pump and all associated valves and penstocks, enabling works and repair and replacement of road surface, together with the repair and replacement of the following items within the group water scheme compound; kerbing, concrete footpaths, tarmac surfacing, top soiling and re-seeding, as required.
Works
27/11/2020 16:00:00
45232150-8 Works related to water-distribution pipelines
44161200-8 Water mains
45000000-7 Construction work
45231100-6 General construction work for pipelines
45231300-8 Construction work for water and sewage pipelines
Tullaher Group Water Scheme
Carraig Nua, Newtown
Co.Clare
Kilkee
Ireland
View profile
Ciara McKenna
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 02/11/2020 16:00 |