Watermain Pipe Enabling Works for the proposed 50 Bed Residential Care Centre (RCC) on the Sean Purcell Road (R332), Tuam, Co. Galway. The works will include the installation of a new 150mm diameter HDPE watermain pipe along with ducting within the same trench to serve the bulk water meters and re-diversion of ESB overhead power lines via underground duct pipework within the proposed RCC site itself. Contractor is to liaise with ESB in regard to excavation of trench route and installation of ducting for re-diverted underground power cables. ESB is to visually inspect open excavated trench on site and the installed section of ducting/infill material and marker tape, prior to backfilling of any duct pipework. The route of these underground power cables, has been agreed with ESB and is shown on the M&E drawings. he new 150mm diameter HDPE watermain pipe connection will be made within the public footpath along Vicar Street that is to the west of the proposed RCC development. The new 150mm diameter watermain pipe will traverse across land owned by the HSE within the Former Grove Medical, through the Primary Care Centre (PCC) that is leased out by the HSE and the pipe is to be capped 1.0m within our proposed RCC development.
Works
13/08/2020 15:00:00
45000000-7 Construction work
45112400-9 Excavating work
45113000-2 Siteworks
45210000-2 Building construction work
45215100-8 Construction work for buildings relating to health
45231110-9 Pipelaying construction work
45232150-8 Works related to water-distribution pipelines
Health Service Executive (HSE)
Head Office
Millennium Park
Naas
Ireland
View profile
Liam Flannery
http://www.hse.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 15/07/2020 12:30 |