Fit out of new plumbing and carp - Fit out of new plumbing and carpentry workshops at GRETB Training Centre, Mervue Business Park, Mervue, Co. Galway. H91 CDW6

The RFT has ended, you cannot answer the invitation.

This Cover letter is part of the Contract Documents and should be read in conjunction with the ITT and other contract documents noted above.

 

The appointed contractor will also be required to act as the Project Supervisor Construction Stage (PSCS) for the project. Collins Boyd Engineering Limited will act as the PSDP for these works. A Preliminary Health and Safety Plan is enclosed in the Information Pack. A construction stage Health and Safety Plan will be required from the PSCS prior to and revisions thereto during the construction stage.

 

Tender submissions are to be submitted as outlined in the instructions to tender. A Pricing Submission and a PSCS Competency Questionnaire will be required as outlined in the instructions to tender.

 

The details of the proposed works to be carried out are outlined on Volume A of this tender including on the drawings and also in the Volume C Pricing document. Notwithstanding the contents of this specification and associated drawings, the Contractor shall be fully responsible for the completion of the works to ensure that they are handed over so that the general design intend is realised. The Contractor shall include in the tender for all necessary items not specifically mentioned or indicated, to achieve this objective. The Contractor must accept the site as he finds it although for his assistance and guidance, tender documents and drawings have been provided to aid the Contractor with setting out the works and in submitting this tender.

 

The Contractor shall be deemed to have examined the Tender Documents and drawings and to have satisfied himself as to the full extent and nature of the work, the manner in which it must be carried out. Should the Contractor have any queries regarding the intent and meaning of the Contract, the Tender Documents, or the drawings, he shall, before submission of his Tender obtain clarification in writing from the Employer Representative as per the ITT. No allowance will be made for failure on the part of the Contractor to fully acquaint himself of the nature of the site and to inform himself on all environmental matters subject always to the natural rights of any Contractor to make a valid claim in the event of unforeseen physical obstacles being encountered of such a nature as to interfere with the expeditious progress of the work.