The proposed works comprise the design, manufacture and installation of a pedestrian access bridge and instrument bridge for the Wave Basin in the National Ocean Test Facility (NOTF) located in Ringaskiddy.The Installation only of a client issue camera Truss Gantry is also a requirement. A brief scope of the proposed construction works are as follows:- Pedestrian Bridge. Facility to provide a pedestrian bridge to give personnel access over the central test area of the wave basin to assist in the setup and adjustment of models on test. The pedestrian bridge will need to span the width of the Ocean Basin. Instrument Bridge. Facility to provide an Instrument Bridge to mount wave measurement probes and other instrumentation when testing a modeled device or structure. It supports the associated wiring a safe distance above the water and ensures that it does not restrict the model during testing. Motorisation of Bridges. It will be a requirement that the access bridge and instrument bridge both be motorised and have the ability to move independently of each other. Positioning/Installation of a Client supplied Instrument Truss over the Ocean Basin.
Works
13/04/2018 12:00:00
45223110-0 Installation of metal structures
45000000-7 Construction work
45223100-7 Assembly of metal structures
45223210-1 Structural steelworks
45223820-0 Prefabricated units and components
45255400-3 Fabrication work
45300000-0 Building installation work
45310000-3 Electrical installation work
45350000-5 Mechanical installations
45400000-1 Building completion work
71320000-7 Engineering design services
University College Cork ( UCC )
6 Elderwood
College Rd
Cork
Ireland
View profile
Capital Projects Office UCC
http://www.ucc.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 16/03/2018 19:00 |
| Contract Award Notice (eTenders) | 29/08/2018 19:00 |