WH5205 - Wh5205 N52 Cloghan to Billistown Phase 2 - Turin to Billistown Realignment - Site Investigation Contract

The RFT has ended, you cannot answer the invitation.

To carry out a detailed ground investigation of the lands affected by the proposed realignment of the N52 Cloghan to Billistown Phase 2 - Turin to Billistown Realignment. The proposed route is 6km in length. The Contract is intended to provide information for the Employer in respect of the ground conditions along the proposed N52 realignment. The Contract provides for the sinking of boreholes and rotary core holes, excavation of trial pits, DPH's, vane tests, rock sampling, laboratory testing and preparation of a factual report in accordance with the Specification, Bill of Quantities and Drawings. The full scope of the Works and the obligations of the Contractor are to be ascertained by reference to the Contract as a whole.

Works

05/03/2018 15:30:00

45111250-5  Ground investigation work
45120000-4  Test drilling and boring work
71351500-8  Ground investigation services


Westmeath County Council
Áras An Chontae, Mountstreet, N91 FH4N
Mullingar
County Westmeath
Ireland
View profile

Ambrose Clarke
http://www.westmeathcoco.ie/

Published notices
Contract Notice (eTenders) 12/02/2018 13:30
Lots
WH5205 N52 Cloghan to Billistown Phase 2 - Turin to Billistown Realignment - Site Investigation Contract
Instructions to bidder:

As stated in Tender Documentation available for download

Additional information:
Documents Documents
RFT mailing address:
Westmeath County Council, Aras an Chontae
Mullingar
Co.Westmeath
Ireland
Close