The scope of work for the Electrical Upgrade Summer Works at Ennis Community College includes as follows:- a) Isolation, removal and disposal of the redundant electrical services to a licenced waste facility including sub distribution fuse boards b) Partial replacement of sub distribution boards and sub mains cabling c) Provision of supplementary containment systems as required to fully contain all new wiring and cabling systems – existing containment to be retained where feasible d) Partial upgrade of existing general service and equipment power wiring to current ETCI Standards. e) New lighting and emergency lighting systems including a partial re-wire to current ETCI Standards throughout the school f) Partial upgrade of ICT structured wiring systems g) New protective services including fire detection and alarm system type L3 throughout the school h) New disabled WC alarm systems i) All associated alterations to the existing electrical services installations j) Testing & commissioning and certification of the upgraded electrical installations k) All associated builders works, opening up, making good and re-decoration to match existing finishes l) Full contract clean of the entire school building prior to handover m) Maintenance of the new installations for the defects liability period (12 months)
Works
29/06/2017 12:00:00
45214200-2 Construction work for school buildings
45214220-8 Secondary school construction work
45310000-3 Electrical installation work
45311100-1 Electrical wiring work
45315100-9 Electrical engineering installation works
45317000-2 Other electrical installation work
45317300-5 Electrical installation work of electrical distribution apparatus
45453100-8 Refurbishment work
Limerick and Clare Education and Training Board
Procurement/Capital Works Section, Station Road
Co.Clare
Ennis
Ireland
View profile
Saundra O'Brien
https://lcetb.ie/
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 09/06/2017 20:30 |