The proposed summer works mechanical upgrade project is required for the entire school building with a gross floor area of approx. 715m2 and comprising of the following works:- (1) Isolation, removal and disposal of all redundant heating services to a licenced waste facility (2) Upgrade of the heating services and associated heating controls. (3) Electrical works associated with the upgrade of the heating controls. (4) New two pipe gun barrel heating system throughout the school. (5) Replacement of Radiators (6) New Cold Water Storage Tank (7)New Fuel Oil Storage Tank, (8)Testing & commissioning of the upgraded mechanical services. (7) All builders work and redecoration associated with Mechanical upgrade (8) Full contract clean of the entire school building prior to handover. (9) Maintenance during the 12 months defects period
Works
23/06/2017 14:30:00
45331100-7 Central-heating installation work
45332200-5 Water plumbing work
45350000-5 Mechanical installations
45453100-8 Refurbishment work
Ballyagran National School
Ballyagran
Co.Limerick
Kilmallock
Ireland
View profile
John Fahey
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 09/06/2017 20:00 |