16/312 - Courtmacsherry & Timoleague Sewerage Scheme – Wastewater Treatment Plant DBO Contract

The RFT has ended, you cannot answer the invitation.

The contract consists of the design, construction, testing, operation and maintenance of the wastewater treatment plant (WwTP) and associated wastewater network and pumping stations as follows: The Design Build (1 year) requirements will include: • New 2,500 PE WwTP at Courtmacsherry • Approx. 1.2 km of new outfall pipeline at the WwTP • New combined sewer overflow at Timoleague • New sewer network pipelines in Courtmacsherry (approx. 75m) • New sewer network pipelines in Timoleague (approx. 520m) • New pumping station and associated rising main (approx. 3.6km) at Timoleague • New pumping station and associated rising main (approx. 1.2km) at Courtmacsherry • Rehabilitation of existing sewers, culverts and manholes • Upgrading of 2 No. pumping stations • Decommissioning and demolition of existing wastewater infrastructure not incorporated into the Works along with disposal of all associated redundant equipment and materials and site reinstatement • Commissioning and testing of all works • Carry out the role of Project Supervisor Design Process (PSDP) and Project Supervisor Construction Stage (PSCS) The Operation Service requirements will include operation and maintenance of the WWTP and collections network (including pumping stations) for a 7-year period, following completion of the Design Build Period. Operation and maintenance of existing pumping stations (2 No.) and septic tanks (2 No.) will be required from date of takeover.

Works

06/02/2017 12:00:00

45252127-4  Wastewater treatment plant construction work
45231300-8  Construction work for water and sewage pipelines
45232423-3  Sewage pumping stations construction work
45315100-9  Electrical engineering installation works
45351000-2  Mechanical engineering installation works
90481000-2  Operation of a sewage plant


Uisce Éireann
Tender Administration, PO Box 900, Webworks, Eglinton Street,
Co.Cork
Cork
Ireland
View profile

Tender Admin
https://www.water.ie/

Published notices
Contract notice - utilities (TED (v209)) 19/12/2016 15:10
    Corrigendum (TED (v209)) 13/01/2017 12:25
Contract award notice - utilities (TED (v209)) 01/07/2020 09:40
Lots
Courtmacsherry & Timoleague Sewerage Scheme – Wastewater Treatment Plant DBO Contract

The contract consists of the design, construction, testing, operation and maintenance of the wastewater treatment plant (WwTP) and associated wastewater network and pumping stations. Please refer to the PQQ for further details.

Instructions to bidder:

A pre-qualification questionnaire will be available to all candidates who express an interest via eTenders in the competition. Please submit all queries via email for the attention of The Shared Services Procurement Manager to Tenders@ervia.ie The questionnaire must be completed and returned to the address in I.1. above not later than 12.00hrs Monday 30th January 2017.

Additional information:
Documents Documents
RFT mailing address:
tenders@ervia.ie
Ireland
Close