The existing central LPHW system consists of a single oil fired boiler that has reached its life expectancy and is due for replacement. The boiler has a primary flue which is routed to the exterior through the plant room wall and into a chimney where it rises to roof level. The boiler serves a one pipe LPHW heating distribution system. The existing heating installation within the plant room is currently connected to a local time clock controller located in the plant room. This project will entail stripping out of the current boiler system and associated local controls etc prior to installation of the new replacement boilers. These will be operated in conjunction with a new cascade system/boiler sequence controllers.
Works
14/12/2016 12:00:00
42160000-8 Boiler installations
44620000-2 Central-heating radiators and boilers and parts
45331100-7 Central-heating installation work
45331110-0 Boiler installation work
45350000-5 Mechanical installations
51100000-3 Installation services of electrical and mechanical equipment
Dublin & Dun Laoghaire Education and Training Board
1 Tuansgate, Belgard Square East, Tallaght
Dublin 24
Dublin
Ireland
View profile
Emer Roy
http://www.ddletb.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 05/12/2016 15:00 |
| Contract Award Notice (eTenders) | 28/02/2017 14:01 |