Healthcare Fit Out

The RFT has ended, you cannot answer the invitation.

The existing building is part of the large, mixed use development "Tallaght Cross West", which is located in Tallaght Town Centre. The existing office building was developed to a shell and core standard. It is proposed to fit the shell and core building out to provide out patient services for the Regional HSE Orthodontic Unit and Tallaght Hospitals Endocrinology and Dermatology Departments within an existing 5 storey over 3 storey basements office block with a gross internal floor area of 2,842sqm

Works

28/11/2016 17:00:00

45350000-5  Mechanical installations
45351000-2  Mechanical engineering installation works
51100000-3  Installation services of electrical and mechanical equipment
51120000-9  Installation services of mechanical equipment
71334000-8  Mechanical and electrical engineering services


Health Service Executive (HSE)
Head Office
Millennium Park
Naas
Ireland
View profile

Anna Boch
http://www.hse.ie

Published notices
Contract notice (TED (v209)) 20/10/2016 20:40
Lots
Healthcare Fit Out (Simms, Tallaght)
Additional information:
Documents Documents
RFT mailing address:
HSE Estates, Bridge House,
Cherry Orchard Hospital,
Ballyfermot, Dublin 10 (D10 Y821)
Ireland
Close