The works will involve the removal of an existing disused slipway and dredging of the seabed material within the vicinity of the slipway at An Daingean Fishery Harbour Centre, Co. Kerry. The seabed dredging will include the removal of loose overburden and underlying rock. The top 1m of loose material contains contaminants. All the soft dredge material is to be removed from site for disposal at sites with appropriate licences. The hard dredge material is to be reused within the existing area of the revetment.
Works
25/09/2015 12:00:00
45241000-8 Harbour construction works
Department of Agriculture, Food and the Marine
Agriculture House
Kildare Street
Dublin 2
Ireland
View profile
Noel O'Murchu
http://www.agriculture.gov.ie
| Notice | Date of dispatch |
|---|---|
| Contract Notice (eTenders) | 28/08/2015 17:30 |
| Contract Award Notice (eTenders) | 09/11/2015 12:30 |