Documents - Lot 90121:1 - Construction of new 3 classroom school at Bonniconlon, Ballina, Co. Mayo
Document available to download
Size (kB)
contractor letter.pdf
132
double slab detail.pdf
154
HydroChamber Design Manual.pdf
566
HydroChamber Installation Manual.pdf
522
PW-CF6_Appointment_of_Project_Supervisor (6).doc
60
PW-CF6_Contract.pdf
105
QW2_Appendix_A2 (5).dot
42
QW2_Appendix_A2 (5).pdf
69
QW2_Appendix_B1 (3).dot
67
QW2_Appendix_C1 (5).doc
46
QW2_Appendix_D (3).dot
33
QW2_Appendix_E (3).dot
42
QW2_Appendix_F (3).dot
41
QW2_Appendix_G (3).dot
32
QW2_Appendix_H (3).dot
33
SCHEDULE.pdf
148
Specification and Schedule of Works.pdf
863
TD-01 EXISTING SITE LAYOUT PLAN.pdf
264
TD-02 EXISTING PLANS, ELEVATION, SECTION & DETAILS.pdf
233
TD-03 EXISTING SHELTER.pdf
128
TD-04 PROPOSED SITE LAYOUT PLAN.pdf
1358
TD-05 BUILDER WORKS PHASE 1.pdf
170
TD-06 BUILDER WORKS PHASE 2.pdf
1063
TD-07 BUILDER WORKS PHASE 3.pdf
1344
TD-08 BUILDER WORKS PHASE 4.pdf
1303
TD-09 PROPOSED PLAN, ELEVATIONS, SECTION & DETAILS.pdf
1298
TD-10 ELECTRICAL AND MECHANICAL.pdf
471
TD-11 WINDOW & DOOR SCHEDULE.pdf
399
TD-12 FLOORING.pdf
294
TD-13 TYPICAL MONO-RIDGE TO BLOCKWORK DETAIL.pdf
185
TD-14 TYPICAL VERGE DETAIL.pdf
183
TD-15 TYPICAL APRON RIDGE FLASHING DETAIL.pdf
195
TD-16 TYPICAL HI-LINE GUTTER DETAIL.pdf
182
TD-17 TYPICAL VALLEY DETAIL.pdf
173
TD-18 RETAINING WALL.pdf
99
TD-19 FRONT BOUNDARY WALL DETAILS.pdf
194
TD-20 SITE DETAILS.pdf
546
TD-21 WINDOW & WALL DETAILS.pdf
238
TD-22 WALL TIE DETAILS.pdf
100
TD-23 FOUNDATION SECTIONS & DETAILS.pdf
826
TD-24 STEEL FRAME 3D.pdf
337
TD-25 STEEL FRAME GL 1.pdf
171
TD-26 STEEL PLAN.pdf
385
TD-27 PROPOSED SHELTER.pdf
132
TD-28 SITE SECTION B-B.pdf
247
tender breakdown complete project.pdf
191
Tender Breakdown Phase 1 only.pdf
191
tender form.pdf
203