CTM
Instructions:
Here are all documents for specified lot. Some documents are available to download without the need to logon.
Documents - Lot 75181:1 - Mechanical Installations for The ASSERT Centre Project -UCC Brookfield Health Sciences Complex
Document available to download
Size (kB)
1314-101_Site layout_Rev B.pdf
911
1314-110_Site Management Plan_Rev C.pdf
2362
1314-190_Existing Site Survey_Rev C.pdf
1048
1314-200_LGF, UGF, L01 & L02 Plans_Rev J.pdf
1128
1314-201_Plant & Roof Plans_Rev C.pdf
332
1314-300_G.A Sections_Rev B.pdf
914
1314-400_Elevations E+N_Rev D.pdf
957
1314-401_Elevations W+S_Rev D.pdf
851
140307 M&E Addendum No 1 Friday 7th March 2014.zip
73283
140312 M & E Addendum No 2.zip
13009
140326 M & E Tender Addendum No 3.zip
5243
2014-02-13 C524 UCC Assert Mechanical Document Transmittal.pdf
62
Assert - Fire & DAC applications_Rev A.zip
23941
C000-235-SP-001 General Conditions - Mechanical Rev. A.pdf
180
C000-235-SP-002 Piping Material Gen Spe Rev E.pdf
193
C000-235-SP-003 General Spec for Ductwork & Accessories Rev. A.pdf
209
C000-235-SP-004 General Spec for Fans Rev. A.pdf
178
C000-235-SP-005 General Spec for Air Distribution Devices Rev A.pdf
172
C000-235-SP-006 General Spec for HEPA Filters Rev. A.pdf
172
C000-235-SP-007 General Spec for Testing, Adjusting & Balancing Rev B.pdf
135
C000-235-SP-008 General Spec for Control Panels Rev. A.pdf
167
C000-235-SP-009 General Spec for Hydronic Heating Coil Rev. A.pdf
155
C000-235-SP-011 General Duct & Equip Insulation Spec Rev D.pdf
109
C000-235-SP-012 General Pipework & Equip Insulation Spec Rev E.pdf
217
C000-235-SP-013 General Spec for Pipework Erection Rev. A.pdf
191
C000-235-SP-017 Pipework Supports & Hangers Rev. A.pdf
96
C000-235-SP-022 Piping Pressure Testing Rev. A.pdf
56
C000-235-SP-023 Above Ground Drainage Rev. A.pdf
37
C000-235-SP-024 Natural Gas Pipework Rev. A.pdf
61
C000-235-TP-001 Piping Test Pack.pdf
108
C501-235-DS-001 AHU-001 - Rev P1.pdf
101
C501-235-DS-002 AHU-002 - Rev P1.pdf
59
C5240-MD-010.pdf
169
C5240-MD-011.pdf
125
C5240-MD-012.pdf
129
C5240-MD-020.pdf
125
C5240-MD-021.pdf
138
C5240-MD-022.pdf
338
C5240-MD-030.pdf
98
C5240-MD-031.pdf
148
C5240-MD-040.pdf
106
C5240-MD-041.pdf
247
C5240-MD-050.pdf
83
C5240-MP-001.pdf
187
C5240-MS-001.pdf
336
C5240-MW-301.pdf
413
C524-235-DS-004 Fan Coil Schedule Rev A.pdf
84
C524-235-DS-005 ACU Schedule.pdf
77
C524-235-DS-006 Grilles & Diffusers.pdf
120
C524-235-DS-007 Extract Fan EF01.pdf
58
C524-235-DS-008 Extract Fan EF02.pdf
58
C524-235-DS-009 Radiator Schedule.pdf
107
C524-235-DS-010 LPHW-PU-05-06.pdf
53
C524-235-DS-011 LPHW-PU-01-02.pdf
53
C524-235-DS-012 LPHW-PU-03-04.pdf
53
C524-235-PD-001 RevA.pdf
270
C524-235-SW-001 Rev A.pdf
449
C524-235-SW-002 Rev A.pdf
357
C524-265-TC01 Rev C.pdf
69
C524-EB-001.pdf
123
C524-ED-001.pdf
128
C524-ED-001.pdf
128
C524-ED-002.pdf
188
C524-ED-003.pdf
145
C524-ED-004.pdf
155
C524-ED-005.pdf
113
C524-ED-006.pdf
837
C524-ED-007.pdf
713
C524-ED-008.pdf
500
C524-ED-009.pdf
493
C524-EE-001.pdf
149
C524-EF-001.pdf
147
C524-EF-101.pdf
143
C524-EF-201.pdf
174
C524-EF-301.pdf
220
C524-EG-001.pdf
212
C524-EG-101.pdf
140
C524-EG-201.pdf
386
C524-EG-301.pdf
475
C524-EK-001.pdf
196
C524-EK-002.pdf
288
C524-EL-001.pdf
209
C524-EL-101.pdf
147
C524-EL-201.pdf
278
C524-EL-301.pdf
277
C524-EP-001.pdf
635
C524-EP-101.pdf
201
C524-EP-201.pdf
449
C524-EP-301.pdf
405
C524-MG-001.pdf
144
C524-MH-001.pdf
368
C524-MH-101.pdf
196
C524-MH-201.pdf
520
C524-MH-301.pdf
638
C524-MH-401.pdf
192
C524-MP-005.pdf
318
C524-MP-006.pdf
405
C524-MP-101.pdf
173
C524-MP-201.pdf
349
C524-MP-301.pdf
290
C524-MP-401.pdf
176
C524-MQ-001.pdf
114
C524-MQ-201.pdf
158
C524-MQ-301.pdf
160
C524-MQ-401.pdf
92
C524-MW-001.pdf
212
C524-MW-101.pdf
176
C524-MW-201.pdf
311
C524-MW-301.pdf
314
C524-MW-401.pdf
125
C524-MZ-101.pdf
362
Drawing Issue Sheet.pdf
63
FTS1-Mechanical.doc
441
ITTW2_Instruction_to_Tender - Mechanical.doc
373
Main Contractor Prelims (With Addendum 28-3-14).pdf
2786
Main Contractor Prelims.pdf
328
plot.log
9
plot.log
3
QW2_Appendix_A.doc
40
QW2_Appendix_A1.doc
32
QW2_Appendix_B1.doc
68
QW2_Appendix_B2.doc
48
QW2_Appendix_C1.doc
49
QW2_Appendix_C2.doc
48
QW2_Appendix_C3.doc
47
QW2_Appendix_C5.doc
46
QW2_Appendix_D.doc
33
QW2_Appendix_E.doc
42
QW2_Appendix_F.doc
41
QW2_Appendix_G.doc
33
QW2_Mechanical.doc
447
QW2_Supplement_3.4.1.doc
83
QW2_Supplement_3.4.3.doc
100
The Assert - Preliminary Safety & Health Plan Incl.DRA's_14.02.13_Issued with M&E Tender.pdf
657
The Assert_Wilson Architecture_Job No 1314_Contract Drawing & Document List_Rev B.pdf
189
Print...
Close window