Documents - Lot 242218:1 - 3719 SMH Ballymun - MW (2022) - Main works for St.Michael's Special National School (Ballymun) extension, including construction, demolition and alteration works and all associated site works
Document available to downloadSize (kB)
document  00_INFORMATION PACK cover.pdf159
document  01_Preliminary Safety & Health Plan.pdf1784
document  02_Planning Permission_FULL SET.pdf45326
document  03_Fire Safety Certificate_FULL SET.pdf6678
document  04_Disability Access Certificate_FULL SET.pdf6939
document  05.1_Asbestos Survey.pdf751
document  05.2_Site investigation report.pdf17509
document  05.3_Site survey.DWG416
document  05.3a_Site survey.pdf327
document  05.3b_Site survey.pdf311
document  05.4_OSI map.DWG228
document  05.4a_OSI map.pdf32
document  05.5_Slit Trench.pdf4701
document  05.6_Water Pressure Test.pdf998
document  06.1a_GAS GNI NETWORK ,ESRI 1000.pdf629
document  06.1b_GAS GNI diversion.pdf196
document  06.2_Irish Water.pdf2332
document  07_RIAI_Information_Notes_on_Preparation_of_Tender_Documents_Edition_1_2014_2_.pdf7946
document  08_Albert Strain & Associates - Note on Software version of Pricing Document.pdf55
document  09_Transitional Protocol.pdf589
document  10_CIF Construction Sector C-19 Pandemic SOP_V11.pdf895
document  11_PW-CF5-v2.6-07-01-2022.pdf915
document  15_179 - Ballymun School Extension - Issue 6.pdf77
document  15_179_00_4000-P02-COVER SHEET.pdf227
document  15_179_00_4001-P01-SITE LOCATION MAP.pdf544
document  15_179_00_4002-P01-EXISTING SITE SURVEY AND LEVELS.pdf467
document  15_179_00_4003-P01-BOREHOLE LOCATIONS.pdf211
document  15_179_00_4005-P01-PROPOSED SITE LAYOUT AND LEVELS.pdf1527
document  15_179_00_4006-P02-PROPOSED ADDITIONAL CAR PARKING.pdf642
document  15_179_00_4052-P02-PROPOSED SITE WORK DETAILS.pdf457
document  15_179_00_4100-P03-EXISTING AND PROPOSED WATERMAIN.pdf474
document  15_179_00_4200-P02-EXISTING AND PROPOSED SURFACE WATER.pdf601
document  15_179_00_4300-P02-EXISTING AND PROPOSED FOUL SEWER.pdf615
document  15_179_00_4400-P01-ENTRANCE LAYOUT.pdf472
document  15_179_00_4900-P01-PROPOSED STANDARD DETAILS (SHEET 1).pdf564
document  15_179_00_4901-P01-PROPOSED STANDARD DETAILS (SHEET 2).pdf659
document  15_179_00_4902-P01-PROPOSED STANDARD DETAILS (SHEET 3).pdf457
document  15_179_00_4903-P01-PROPOSED STANDARD DETAILS (SHEET 4).pdf505
document  15_179_00_6010-P01-PROPOSED RAMP DETAILS.pdf299
document  15_179_00_6011-P01-PROPOSED RETAINING WALL DETAILS.pdf330
document  15_179_01_6100-P02-PROPOSED FOUNDATION PLAN.pdf421
document  15_179_01_6101-P03-PROPOSED GROUND FLOOR PLAN.pdf326
document  15_179_01_6110-P03-PROPOSED ROOF PLAN.pdf779
document  15_179_01_6111-P01-PROPOSED UBLOCK LAYOUT.pdf528
document  15_179_01_6115-P02-PROPOSED SECTION (SHEET 1).pdf339
document  15_179_01_6116-P04-PROPOSED SECTION (SHEET 2).pdf543
document  15_179_01_6117-P03-PROPOSED SECTION (SHEET 3).pdf482
document  15_179_01_6118-P01-PROPOSED SECTION (SHEET 4).pdf191
document  15_179_01_6120-P01-PROPOSED CANOPY AT THE ENTRANCE.pdf342
document  15_179_01_6125-P02-PROPOSED BIN STORE.pdf268
document  15_179_01_6501-P04-PROPOSED BAND BEAMS ELEVATIONS.pdf329
document  15_179_01_6502-P02-HIGH LEVEL BAND BEAMS RC DETAILS.pdf653
document  3719_schedule of doors_Rev C.pdf682
document  3719_schedule of finishes_Rev .pdf1105
document  3719_schedule of ironmongery_Rev C.pdf1317
document  3719_schedule of sanitaryware_Rev .pdf1410
document  3719_Spec 00 Demo_Rev A.pdf1120
document  3719_Spec 01 Arch Gen_Rev A.pdf746
document  3719_Spec 02 Windows_Rev .pdf1600
document  3719_Spec 03 Roofing_Rev .pdf9007
document  Albert Strain & Assoc Pricing Document - Opt A.pdf1595
document  Albert Strain & Assoc Pricing Document - Opt B.pdf524
document  DoE ITT W2 - Instruction to Tenderers (Open) - Feb2022_SMH_MW_2022.pdf421
document  DoES - QW2 Suitability Assessment Questionnaire Open-Apr2019_SMH_MW_2022.pdf484
document  DoES DTP-2012 Letter of Invitation - Nov2016_SMH_MW_2022.pdf115
document  Electrical Spec Tender R3.pdf430
document  Form of Tender & Schedule (FTS-5-v2.5-07-01-2022)_SMH_MW_2022_OPTION A.pdf419
document  Form of Tender & Schedule (FTS-5-v2.5-07-01-2022)_SMH_MW_2022_OPTION B.pdf419
document  J09 - Mech Issue Sheet Options A&B (T).pdf63
document  J09 - Elec Issue Sheet Options A&B (T).pdf55
document  J09 - St Michael's School - Option A Mechanical specification Tender.pdf1176
document  J09 - St Michael's School - Option B Mechanical specification Tender.pdf1249
document  J09-60-01A&B.pdf200
document  J09-60-SS.A&B.pdf702
document  J09-62-01A&B.pdf1553
document  J09-62-R0-B.pdf162
document  J09-63-01A&B.pdf1560
document  J09-63-SS.A&B.pdf722
document  J09-66-01A.pdf1307
document  J09-66-01B.pdf1323
document  J09-67-01A&B.pdf1377
document  J09-68-01A&B.pdf1320
document  J09-69-01A.pdf147
document  J09-69-01B.pdf149
document  Opt.A-M1 - OPTION A GAS NETWORK ONSITE.pdf1607
document  Opt.A-M2 - OPTION A New Boiler Room Layout & Removal of old boiler room.pdf333
document  Opt.A-M3 - OPTION A Heat Pump heating to new NZEB classrooms ^0 admin.pdf1657
document  Opt.A-M4 - OPTION A Water Services.pdf846
document  Opt.A-M5 - OPTION A Ventilation Services.pdf1108
document  Opt.A-M6 - OPTION A Part gas heating and full gas water services.pdf295
document  Opt.A-M7 - OPTION A Water services & Ventilation Details.pdf217
document  Opt.A-M8 - Soils & Waste Sheets 1.pdf1025
document  Opt.A-M9- Soils & Waste Sheets 2.pdf541
document  Opt.B-M1 - OPTION B GAS NETWORK ONSITE.pdf1607
document  Opt.B-M10 - Soils & Waste Sheets 1.pdf1025
document  Opt.B-M11 - Soils & Waste Sheets 2.pdf541
document  Opt.B-M2 - OPTION B New Boiler room, 100% Gas heating layout.pdf416
document  Opt.B-M3 - OPTION B New 100% Gas plant to serve NZEB classroom & Existing School.pdf899
document  Opt.B-M4 - OPTION B Water Services.pdf718
document  Opt.B-M5 - OPTION B Ventilation Services.pdf973
document  Opt.B-M6 100% GAS HEATING DIAGRAMATTIC.pdf278
document  Opt.B-M7 - OPTION B 100% Gas Hot Water Heating.pdf269
document  Opt.B-M8 - DETAILS FOR HEATING CONTROL SYSTEM..pdf366
document  Opt.B-M8 - DETAILS FOR HEATING CONTROL SYSTEM..pdf366
document  Opt.B-M9 - Heating, Water & Vent Services Details for NZEB Classrooms.pdf242
document  Project Particulars_SMH_MW.pdf3391
document  RPT-15_179-001 Civil & Structural Specification.pdf895
document  RPT-15_179-001 Demolition Specification Main Works.pdf524
document  VOLUME A.3.1_TD_1001_OSI_MAP.pdf229
document  VOLUME A.3.1_TD_1002_TOPOGRAPHICAL SURVEY - SMH CAMPUS.pdf499
document  VOLUME A.3.1_TD_1003_TOPOGRAPHICAL SURVEY - SCHOOL SITE.pdf406
document  VOLUME A.3.1_TD_1010_EXISTING_SITE_PLAN_prior to essential preparatory works.pdf830
document  VOLUME A.3.1_TD_1011_EXISTING_GF_prior to essential preparatory works_revA.pdf344
document  VOLUME A.3.1_TD_1012_EXISTING_ROOF_prior to essential preparatory works.pdf245
document  VOLUME A.3.1_TD_1013_EXISTING_SECTION_ELEVATIONS_prior to essential preparatory works.pdf483
document  VOLUME A.3.1_TD_1014_EXISTING_ESTATE_LAYOUT_after essential preparatory works.pdf914
document  VOLUME A.3.1_TD_1015_EXISTING_SITE_PLAN_after essential preparatory works.pdf892
document  VOLUME A.3.1_TD_1016_EXISTING_ROOF_after essential preparatory works_revA.pdf301
document  VOLUME A.3.1_TD_1017_EXISTING_ROOF_after essential preparatory works.pdf233
document  VOLUME A.3.1_TD_1018_EXISTING_SECTION_ELEVATIONS_after essential preparatory works.pdf460
document  VOLUME A.3.1_TD_1019_DEMOLITION_SHEET_01_revB.pdf1917
document  VOLUME A.3.1_TD_1020_DEMOLITION_SHEET_02_revD.pdf401
document  VOLUME A.3.1_TD_1110_PROPOSED_ESTATE_LAYOUT_revC.pdf1307
document  VOLUME A.3.1_TD_1111_PROPOSED_SITE_PLAN_revC.pdf1375
document  VOLUME A.3.1_TD_1112_SITE_WORKS_revE.pdf1485
document  VOLUME A.3.1_TD_1113_SITE_FURNITURE_revA.pdf699
document  VOLUME A.3.1_TD_1114_SERVICES DIVERSION_revA.pdf904
document  VOLUME A.3.1_TD_1115_CANOPY.pdf509
document  VOLUME A.3.1_TD_1116_FENCES-GATES.pdf619
document  VOLUME A.3.1_TD_1117_BIN STORE.pdf693
document  VOLUME A.3.1_TD_1118_ADDITIONAL PARKING_SHEET_01.pdf930
document  VOLUME A.3.1_TD_1119_ADDITIONAL PARKING_SHEET_02.pdf935
document  VOLUME A.3.1_TD_1120_PROPOSED_GROUND_FLOOR_revF.pdf1369
document  VOLUME A.3.1_TD_1121_PROPOSED_ROOF_revF.pdf720
document  VOLUME A.3.1_TD_1122_PROPOSED_SECTIONS_SHEET_01_revC.pdf646
document  VOLUME A.3.1_TD_1123_PROPOSED_SECTIONS_SHEET_02_revA.pdf701
document  VOLUME A.3.1_TD_1124_PROPOSED_SECTIONS_SHEET_03_revA.pdf332
document  VOLUME A.3.1_TD_1125_PROPOSED_ELEVATIONS_SHEET_01_revB.pdf732
document  VOLUME A.3.1_TD_1126_PROPOSED_ELEVATIONS_SHEET_02_revA.pdf489
document  VOLUME A.3.1_TD_1130_DRAINAGE_SHEET_01_revB.pdf1249
document  VOLUME A.3.1_TD_1131_DRAINAGE_SHEET_02_revA.pdf664
document  VOLUME A.3.1_TD_1132_RADON_LAYOUT.pdf1128
document  VOLUME A.3.1_TD_1133_FLOOR FINISHES_revD.pdf1311
document  VOLUME A.3.1_TD_1134_WALL FINISHES_revD.pdf1074
document  VOLUME A.3.1_TD_1135_CEILINGS_revF.pdf1294
document  VOLUME A.3.1_TD_1136_ASBESTOS REMOVAL WORKS_revA.pdf346
document  VOLUME A.3.1_TD_1140_DETAIL_SECTIONS_SHEET_01_revB.pdf578
document  VOLUME A.3.1_TD_1141_DETAIL_SECTIONS_SHEET_02_revC.pdf567
document  VOLUME A.3.1_TD_1142_DETAIL_SECTIONS_SHEET_03_revB.pdf546
document  VOLUME A.3.1_TD_1143_DETAIL_SECTIONS_SHEET_04_revB.pdf544
document  VOLUME A.3.1_TD_1144_DETAIL_SECTIONS_SHEET_05_revB.pdf610
document  VOLUME A.3.1_TD_1150_DOOR_TYPES_SHEET_01_revE.pdf401
document  VOLUME A.3.1_TD_1151_DOOR_TYPES_SHEET_02_revD.pdf380
document  VOLUME A.3.1_TD_1152_DOOR_FRAME_TYPES_revA.pdf391
document  VOLUME A.3.1_TD_1153_WINDOW SCHEDULE_revD.pdf576
document  VOLUME A.3.1_TD_1160_ROOM DATA SHEETS_CLASS1_revA.pdf653
document  VOLUME A.3.1_TD_1161_ROOM DATA SHEETS_CLASS2_revA.pdf641
document  VOLUME A.3.1_TD_1162_ROOM DATA SHEETS_CLASS3_revA.pdf665
document  VOLUME A.3.1_TD_1163_ROOM DATA SHEETS_CLASS4_revA.pdf652
document  VOLUME A.3.1_TD_1164_ROOM DATA SHEETS_CLASS5_revC.pdf583
document  VOLUME A.3.1_TD_1165_ROOM DATA SHEETS_CLASS6_revA.pdf646
document  VOLUME A.3.1_TD_1166_ROOM DATA SHEETS_STAFF CANTEEN_revC.pdf452
document  VOLUME A.3.1_TD_1167_ROOM DATA SHEETS_STAFF AREAS_SHEET_01_revB.pdf472
document  VOLUME A.3.1_TD_1168_ROOM DATA SHEETS_STAFF AREAS_SHEET_02_revA.pdf318
document  VOLUME A.3.1_TD_1170_TYPICAL_PLAN_DETAILS.pdf540
document  VOLUME A.3.1_TD_1171_EXISTING_ROOF_DETAILS.pdf384
document  VOLUME A.3.1_TD_1172_TYPICAL SECTION DETAILS_SHEET_01.pdf502
document  VOLUME A.3.1_TD_1173_TYPICAL SECTION DETAILS_SHEET_02.pdf423
document  VOLUME A.3.1_TD_1174_TYPICAL SECTION DETAILS_SHEET_03.pdf374
document  VOLUME A.3.1_TD_1175_TYPICAL SECTION DETAILS_SHEET_04.pdf404
document  VOLUME A.3.1_TD_1180_STEPS-RAMPS-GENTLE-SLOPES-LEVELS_SHEET_01.pdf1178
document  VOLUME A.3.1_TD_1181_STEPS-RAMPS-GENTLE-SLOPES-LEVELS_SHEET_02.pdf831
document  VOLUME A.3.1_TD_1182_STEPS-RAMPS-GENTLE-SLOPES-LEVELS_SHEET_03_revA.pdf898
document  VOLUME A.3.1_TD_1183_STEPS-RAMPS-GENTLE-SLOPES-LEVELS_SHEET_04.pdf976
document  VOLUME A.3.1_TD_1184_STEPS-RAMPS-GENTLE-SLOPES-LEVELS_SHEET_05.pdf1001
document  VOLUME A.3.1_TD_1185_STEPS-RAMPS-GENTLE-SLOPES-LEVELS_SHEET_06.pdf1051
document  VOLUME A.3.1_TD_1186_STEPS-RAMPS-GENTLE-SLOPES-LEVELS_SHEET_07.pdf897
document  VOLUME A.3.1_TD_1187_REPLACEMENT_SHED.pdf479
document  VOLUME A.3.1_TD_1190_LANDSCAPING.pdf1466
document  Works Requirements_SMH_MW.pdf409
Print...Close window