Doiciméid - Pacáiste 230880:1 - Multi-Party Framework for Civil and Structural Engineer-Led Integrated Design Team Consultancy Services for Various Projects Established on Foot of an Initial Contract for the Roof Survey, Design
Doiciméad ar fáil le híoslódáilMéid (kB)
document  1. Bray Roof Refurbishment_AH review.docx14
document  1. ITTS2b_WkCoCo Eng_Led Integrated Design Team.doc378
document  1. QC2_16-07-2013 (12) - Engineering (Lead Consultant).doc561
document  1. WkCoCo Conditions of Engagement COE1.docx77
document  1a. QC2_16-07-2013 (12) - Assigned Certifier.doc561
document  1b. QC2_16-07-2013 (12) - Mechanical Engineer.doc560
document  1c. QC2_16-07-2013 (12) - Quantity Surveyor.doc561
document  1d. QC2_16-07-2013 (13) - Architect.doc561
document  1e. QC2_16-07-2013 (13) - Design Certifier.doc560
document  1f. QC2_16-07-2013 (13) - Electrical Engineering.doc560
document  1g. QC2_16-07-2013 (14) - PSDP.doc561
document  2. Bray Recycling Proposed Works.pdf387
document  2. DRAFT Multi-Party Framework Agreement.docx55
document  2. FTS9-WkCoCo Eng_Led Integrated Design Team.docx252
document  2. WCC Contractor Assessment of Competency.doc44
document  3. Bray Recycling Site Survey.pdf174
document  3. MF_2.3 Collateral Warranties.doc106
document  3. QC2_Appendix_A.doc39
document  4. Bray Recycling Centre - dilipadation survey.pdf5901
document  4. MF_2.4 H&S Compliance General.docx22
document  4. QC2_Appendix_A1.doc31
document  5. Bray Recycling Centre Asbestos Survey 2021.pdf1576
document  5. MF_2.5 PSDP Compliance.docx22
document  5. QC2_Appendix_B1.doc78
document  6. Bray Recycling Survey.pdf416
document  6. MF_2.6 PSCS Compliance.doc43
document  6. QC2_Appendix_B3.doc44
document  7. MF-2.1-PI Insurance Certificate.docx53
document  8. Additional Information Tenderbox - WkCoCo.docx18
document  WkCC Framework Competition Summary.docx28
document  WkCoCo Civil Eng Led IDT Query List 2 - 21Dec2021.pdf17
document  WkCoCo Roof Refurb Pricing Schedule.xlsx21
Priontáil...Dún fuinneog