Documents - Lot 226097:1 - Design Team Services for the Development of 31 Housing Units at Weir Road, Tuam.
Document available to downloadSize (kB)
document  1. Inv to Tender - Weir Road, 2021 - Rev 1.docx16
document  1.1 Schedule Tender Documents - Weir Road - Rev 1.pdf122
document  1.2 Form of Agreement for Technical Consultancy Services.docx57
document  1.3 Confidentiality Agreement - Services - Weir Road.docx49
document  2. ITTS2b - Weir Road 2021 - Rev 1.doc395
document  3. Project Brief and Stage Services - Weir Road - Rev 1.pdf578
document  4. FTS9 Tender and Schedules - Weir Road - Rev 1.docx184
document  5 COE1-v.2h-05-06-2019.docx77
document  6. Pricing Document - Weir Road - Rev 1.pdf171
document  7.0 QC2-v2.0-16-07-2013.doc601
document  7.1 QC2_ Appendix A.doc53
document  7.2 QC2_Appendix A1.doc47
document  7.3 QC2_Appendix B1.dot104
document  7.4 QC2_Appendix B3.doc60
document  7.5 QC2_Appendix D1.docx58
document  7.6 QC2_SF04Rev2 Pre-qualification H&S questionnaire for Designers & PSDP.doc129
document  8.1 Arch Draw 1 - Units Types.pdf1145
document  8.10 Eng Report - Weir Road.pdf554
document  8.11 Flood Risk Assessment (July 2016).pdf2953
document  8.12 IGSL Report - Weir Road, Tuam, Galway.pdf16287
document  8.13 Part VIII - CE Report Signed.PDF384
document  8.14 Weir Road - Topographical Survey.pdf394
document  8.15 GCC Procurement Guidance Note.pdf169
document  8.16 59 Week Programme Info & 4 Stage Approval Process.pdf1839
document  8.17 DHPLG 4 Stage Approval Checklist.pdf1205
document  8.18 Circular 12 2010 - Budget Management & Project Reporting - DHPLG.pdf170
document  8.19 The 59 week target programme.pdf253
document  8.2 Arch Draw 2 - Site Layout and Sections.pdf4652
document  8.20 Employers Reqs for Design of Quality Housing. Rev 1 Sept 2020.pdf1999
document  8.21 Affordable & SSF - Overview & 3 Stage Approvals Procedures.pdf391
document  8.22 Typical Serviced Site Fund & Call for Proposals.pdf811
document  8.23 Circular APH02-2018 - LA Land Activation & Affordable Housing 2018.pdf335
document  8.3 Arch Draw 3 - Site Location.pdf94
document  8.4 Eng Draw 1 - Drainage Layout.pdf676
document  8.5 Eng Draw 2 - Watermain Layout.pdf485
document  8.6 Eng Draw 3 - Roads Layout.pdf499
document  8.7 Eng Draw 4 - Attenuation Details.pdf251
document  8.8 Eng Draw 5 - Drainage Sections.pdf522
document  8.9 Eng Draw 6 - Drainage Details.pdf411
document  9.1 SF70 Rev3 Project Documentation Requirements.pdf223
document  9.10 MF_2.2 Letter of Acceptance.doc59
document  9.11 MF_2.3 Collateral Warranty for Sub Consultants.docx36
document  9.12 MF_2.4 H&S Compliance Declaration by All Services Providers.docx21
document  9.13 MF 2.5 H&S Compliance Declaration by PSDP.docx21
document  9.2 SF41 H&S Site Inspection Template incl C-19.pdf217
document  9.3 SF03 Rev3 Appointment of PSDP (External) Form.pdf28
document  9.4 SF04 Rev2 Pre-qualification H&S questionnaire for Designers & PSDP.pdf87
document  9.5 SF05 Rev4. PSCS Health & Safety Assessment Form.pdf204
document  9.6 SF06 Rev4 Appointment of Project Supervisor for the Construction Stage (PSCS) Form.pdf132
document  9.7 SF08 Rev 2 Sub Contractor Assessment of Competency non-PSCS form.pdf544
document  9.8 Form MF_1.7 Confirmation of Parent Company Support.pdf250
document  9.9 MF-2.1 Professional Indemnity Insurance Certificate.docx50
Print...Close window