Documents - Lot 222696:1 - Appointment of Project Supervisor for the Design Process (PSDP) Services, Errigal Heights
Document available to downloadSize (kB)
document  1001-PL2 - Proposed Drainage Layout.pdf516
document  1002-PL4 - Proposed Watermain Layout.pdf729
document  1003-PL1 - Proposed Pipe bedding details.pdf648
document  1004-PL1 - Proposed manhole details.pdf835
document  1005-PL1 - Proposed watermain details.pdf344
document  4 Stage Approval Process Flowchart.pdf94
document  B Masterplan Information Pack.xlsx12
document  BIM Employers Information Requirements.docx993
document  BIM Execution Plan_Version1.docx183
document  Consultant Engineers Services Report_ERRIGAL HEIGHT.pdf1205
document  Cork City Council Exterior Lighting Design Requirements Rev.10.pdf3649
document  Design Responsibility cross check_July 2021.docx19
document  Design Responsibility cross check_July 2021.pdf103
document  Design Statement_ERRIGAL HEIGHTS.pdf8066
document  EHHD_Drawing Issue Register_20210514.pdf66
document  EHHD_ERRIGAL HEIGHT PART 8 DRAWINGS.pdf38115
document  Employers Requirements for Detail Design of Quality Housing_Sept 2019.pdf1877
document  General Description of Services- PSDP_ERRIGAL HEIGHTS.pdf267
document  Guidelines on Approval Submissions.pdf444
document  Instructions_to_Tenderers PSDP.doc366
document  Invitation to Tender ITTS2.doc31
document  Irish Water_Pre-Connection Enquiry Reponse_ERRIGAL HEIGHTS.pdf519
document  MF1_10 Appointment of Project Supervisor.doc130
document  Public Lighting Preliminary Design_Errigal Heights.pdf4573
document  QC2_Appendix_B1 for each discipline.doc78
document  QC2_Appendix_B3 for each discipline.doc44
document  SAQ H&S Complinace Declar ALL MF_2.4.docx22
document  SAQ Appendix_A Personal Situation Declar.doc39
document  SAQ Appendix_A1 Confirmation of Dec of Oath.doc32
document  SAQ H&S Complinace Declar PSDP MF_2.5.docx22
document  SAQ PI Insurance Cert MF-2.1.docx52
document  SAQ QC2-v2.0 2018_1108.docx125
document  Tender & Schedule FTS9-v1.docx177
document  transmittal part 8 (14-05-21).pdf103
Print...Close window