Documents - Lot 196409:1 - Main works for St.Michael's Special National School Ballymun extension, including construction and demolition works, alteration works to existing school areas and all associated site works.
Document available to downloadSize (kB)
document  00_INFORMATION PACK cover.pdf160
document  01_Preliminary Safety & Health Plan.pdf1784
document  02_Planning Permission_FULL SET.pdf45326
document  03_Fire Safety Certificate_FULL SET.pdf3396
document  04_Disability Access Certificate_FULL SET.pdf6939
document  05.1_Asbestos Survey.pdf751
document  05.2_Site investigation report.pdf17509
document  05.3_Site survey.DWG416
document  05.3a_Site survey.pdf327
document  05.3b_Site survey.pdf311
document  05.4_OSI map.DWG228
document  05.4a_OSI map.pdf32
document  05.5_Slit Trench.pdf4701
document  05.6_Water Pressure Test.pdf998
document  06.1a_GAS GNI NETWORK ,ESRI 1000.pdf629
document  06.1b_GAS GNI diversion.pdf196
document  06.2_Irish Water.pdf2332
document  07_RIAI_InformationNotes_on_Preparation_of_tender_Documents_Edition_1_2014_2_.pdf7946
document  08_Albert Strain & Associates - Note on Software version of Pricing Document.pdf55
document  09_Return to Work Safely Protocol.pdf569
document  10_Construction Sector C-19 Pandemic – Standard Operating Procedures (Version 3).pdf9426
document  11_School Calendar for school year 2020-2021 (DRAFT).pdf167
document  15_179_00_4000-P01-COVER SHEET.pdf298
document  15_179_00_4001-P01-SITE LOCATION MAP.pdf544
document  15_179_00_4002-P01-EXISTING SITE SURVEY AND LEVELS.pdf467
document  15_179_00_4003-P01-BOREHOLE LOCATIONS.pdf211
document  15_179_00_4005-P01-PROPOSED SITE LAYOUT AND LEVELS.pdf1527
document  15_179_00_4006-P02-PROPOSED ADDITIONAL CAR PARKING.pdf642
document  15_179_00_4052-P02-PROPOSED SITE WORK DETAILS.pdf457
document  15_179_00_4100-P01-EXISTING AND PROPOSED WATERMAIN.pdf393
document  15_179_00_4200-P02-EXISTING AND PROPOSED SURFACE WATER.pdf601
document  15_179_00_4300-P02-EXISTING AND PROPOSED FOUL SEWER.pdf615
document  15_179_00_4400-P01-ENTRANCE LAYOUT.pdf472
document  15_179_00_4900-P01-PROPOSED STANDARD DETAILS (SHEET 1).pdf564
document  15_179_00_4901-P01-PROPOSED STANDARD DETAILS (SHEET 2).pdf659
document  15_179_00_4902-P01-PROPOSED STANDARD DETAILS (SHEET 3).pdf457
document  15_179_00_4903-P01-PROPOSED STANDARD DETAILS (SHEET 4).pdf505
document  15_179_00_6010-P01-PROPOSED RAMP DETAILS.pdf299
document  15_179_00_6011-P01-PROPOSED RETAINING WALL DETAILS.pdf330
document  15_179_01_6100-P02-PROPOSED FOUNDATION PLAN.pdf421
document  15_179_01_6101-P02-PROPOSED GROUND FLOOR PLAN.pdf329
document  15_179_01_6110-P02-PROPOSED ROOF PLAN.pdf518
document  15_179_01_6111-P01-PROPOSED UBLOCK LAYOUT.pdf528
document  15_179_01_6115-P02-PROPOSED SECTION (SHEET 1).pdf339
document  15_179_01_6116-P03-PROPOSED SECTION (SHEET 2).pdf428
document  15_179_01_6117-P02-PROPOSED SECTION (SHEET 3).pdf400
document  15_179_01_6120-P01-PROPOSED CANOPY AT THE ENTRANCE.pdf342
document  15_179_01_6125-P02-PROPOSED BIN STORE.pdf268
document  15_179_01_6501 RC Schedule-1.0-.pdf136
document  15_179_01_6501-P03-PROPOSED BAND BEAMS ELEVATIONS.pdf553
document  15_179_01_6502-P01-HIGH LEVEL BAND BEAMS RC DETAILS.pdf895
document  15-1251 - St Michaels Ballymun_GIReport_RevA01-1.0-.pdf17328
document  3719_schedule of doors_Rev B.pdf679
document  3719_schedule of finishes_Rev .pdf1105
document  3719_schedule of ironmongery_Rev C.pdf1317
document  3719_schedule of sanitaryware_Rev .pdf1410
document  3719_Spec 00 Demo_Rev A.pdf1120
document  3719_Spec 01 Arch Gen_Rev A.pdf746
document  3719_Spec 02 Windows_Rev .pdf1600
document  3719_Spec 03 Roofing_Rev .pdf9007
document  Albert Strain & Assoc Pricing Document__SMH_MW.pdf1643
document  DoES-DTP-2012-Letter-of-Invitation-Published-November-2016_SMH_MW.pdf135
document  does-ittw2-instruction-to-tenderers-open-june-2018_SMH_MW.pdf380
document  does-qw2-suitability-assessment-questionnaire-open-revised-april-2019_SMH_MW.pdf485
document  Electrical Spec tender.pdf416
document  FTS-5-v2.3-06-06-2018_SMH_MW.pdf407
document  J09 St. Michaels - Mechanical Specification.pdf1292
document  J09-60-01.pdf200
document  J09-60-SS.pdf702
document  J09-62-01.pdf1552
document  J09-62-RO.pdf162
document  J09-63-01.pdf1559
document  J09-63-SS.pdf724
document  J09-66-01.pdf1316
document  J09-66-02.pdf1300
document  J09-67-01.pdf1377
document  J09-68-01.pdf1320
document  J09-69-01.pdf149
document  Light Fittings Technical Data.pdf58
document  M1.GNI GAS PIPEWORK ALTERATIONS - SITE_PLAN-Gas Site Plan A1 Portrait.pdf1609
document  M10. Option 2 - Full Gas Heating Diagrammatic-NEW BOILERHOUSE.pdf305
document  M11. - Heating Details for NZEB Classrooms-DETAILS.pdf253
document  M12. - Wiring Details for Mechanical Controls-DETAILS.pdf392
document  M12.- Wiring Details for Mechanical Controls-DETAILS.pdf418
document  M13 - Soils and Waste Sheet 1.pdf1181
document  M14 - Soils and Waste Sheet 2.pdf625
document  M2. Option 1 - Plan of Boileroom for Heating Services for NZEB Classrooms-NEW BOILERHOUSE.pdf339
document  M3.Option 1- Heat Pump Layout + Part School Heating-Heating to Old School from New Boileroom..pdf1644
document  M4. Option 1 +2 - Water Services-WATER SERVICES LAYOUT.pdf845
document  M5.Option 1+2 Ventilation Systems for NZEB Classrooms-VENTILATION LAYOUT.pdf1249
document  M6. Option 1 - Part Gas Heating + Water Heating Diagrammatic -NEW BOILERHOUSE.pdf300
document  M7. Option 2- LPHW ( All Gas) Heating Layout-Heating to New School Extensions.pdf976
document  M8. Option 2 - Plan of Boileroom ( All Gas) for Heating Services -NEW BOILERHOUSE.pdf357
document  M9. Option 2 - Full Gas Water Services Diagrammatic -WATER SERVICES DIAGRAMMATIC..pdf287
document  Project Particulars_SMH_MW.pdf2593
document  RPT-15_179-001 Civil & Structural Specification-1.0-.pdf1218
document  RPT-15_179-001 Demolition Specification Main Works.pdf524
document  VOLUME A.3.1_1001_OSI_MAP.pdf233
document  VOLUME A.3.1_1002_TS_CAMPUS.pdf505
document  VOLUME A.3.1_1003_TS_SCHOOL.pdf411
document  VOLUME A.3.1_1010_EX_SITE_PLAN_priorEPW_rev.pdf846
document  VOLUME A.3.1_1011_EX_GF_priorEPW_revA.pdf348
document  VOLUME A.3.1_1012_EX_ROOF_priorEPW_rev.pdf247
document  VOLUME A.3.1_1013_EX_SECT-ELEV_priorEPW_rev.pdf481
document  VOLUME A.3.1_1014_EX_ESTATE LAYOUT_afterEPW_rev.pdf925
document  VOLUME A.3.1_1015_EX_SITE_PLAN_afterEPW_rev.pdf903
document  VOLUME A.3.1_1016_EX_GF_afterEPW_revA.pdf306
document  VOLUME A.3.1_1017_EX_ROOF_afterEPW_rev.pdf235
document  VOLUME A.3.1_1018_EX_SECT-ELEV_afterEPW_rev.pdf459
document  VOLUME A.3.1_1019_DEMOLITION_SH1_revB.pdf1910
document  VOLUME A.3.1_1020_DEMOLITION_SH2_revC.pdf399
document  VOLUME A.3.1_1110_PR_ESTATE LAYOUT_revC.pdf1256
document  VOLUME A.3.1_1111_PR_SITE_PLAN_revC.pdf1284
document  VOLUME A.3.1_1112_SITE_WORKS_revE.pdf1368
document  VOLUME A.3.1_1113_SITE_FURNITURE_revA.pdf701
document  VOLUME A.3.1_1114_SERVICES DIVERSION_revA.pdf915
document  VOLUME A.3.1_1115_CANOPY_rev.pdf503
document  VOLUME A.3.1_1116_FENCES-GATES_rev.pdf621
document  VOLUME A.3.1_1117_BIN STORE_rev.pdf677
document  VOLUME A.3.1_1118_ADDITIONAL PARKING_SH1.pdf872
document  VOLUME A.3.1_1119_ADDITIONAL PARKING_SH2.pdf872
document  VOLUME A.3.1_1120_PR_GF_revE.pdf1177
document  VOLUME A.3.1_1121_PR_ROOF_revE.pdf671
document  VOLUME A.3.1_1122_PR_SECTIONS_revB.pdf625
document  VOLUME A.3.1_1123_PR_SECTIONS_revA.pdf680
document  VOLUME A.3.1_1124_PR_SECTIONS_revA.pdf337
document  VOLUME A.3.1_1125_PR_ELEVATIONS_revB.pdf767
document  VOLUME A.3.1_1126_PR_ELEVATIONS_revA.pdf511
document  VOLUME A.3.1_1130_DRAINAGE_SH1_revA.pdf1069
document  VOLUME A.3.1_1131_DRAINAGE_SH2_revA.pdf577
document  VOLUME A.3.1_1132_RADON-LAYOUT_rev.pdf917
document  VOLUME A.3.1_1133_FLOOR FINISHES_revC.pdf1122
document  VOLUME A.3.1_1134_WALL FINISHES_revC.pdf878
document  VOLUME A.3.1_1135_RCP_revE.pdf1071
document  VOLUME A.3.1_1136_ASBESTOS REMOVAL WORKS_revA.pdf350
document  VOLUME A.3.1_1140_DETAIL_SECTIONS_revB.pdf552
document  VOLUME A.3.1_1141_DETAIL_SECTIONS_revC.pdf547
document  VOLUME A.3.1_1142_DETAIL_SECTIONS_revB.pdf529
document  VOLUME A.3.1_1143_DETAIL_SECTIONS_revB.pdf520
document  VOLUME A.3.1_1144_DETAIL_SECTIONS_revB.pdf589
document  VOLUME A.3.1_1150_DOORS (1)_Rev D.pdf416
document  VOLUME A.3.1_1151_DOORS (2)_Rev C.pdf403
document  VOLUME A.3.1_1152_DOORS (3)_Rev A.pdf391
document  VOLUME A.3.1_1153_WINDOW SCHEDULE_revC.pdf516
document  VOLUME A.3.1_1160_CLASS1_revA.pdf615
document  VOLUME A.3.1_1161_CLASS2_revA.pdf609
document  VOLUME A.3.1_1162_CLASS3_revA.pdf625
document  VOLUME A.3.1_1163_CLASS4_revA.pdf615
document  VOLUME A.3.1_1164_CLASS5_revC.pdf610
document  VOLUME A.3.1_1165_CLASS6_revA.pdf611
document  VOLUME A.3.1_1166_STAFF-CANTEEN_revB.pdf382
document  VOLUME A.3.1_1167_STAFF-AREAS-SH1_revA.pdf456
document  VOLUME A.3.1_1168_STAFF-AREAS-SH2_revA.pdf325
document  VOLUME A.3.1_1170_TYPICAL_PLAN_DETAILS.pdf537
document  VOLUME A.3.1_1171_EX_ROOF_DETAILS.pdf379
document  VOLUME A.3.1_1172_TYPICAL SECTION DETAILS_rev.pdf497
document  VOLUME A.3.1_1173_TYPICAL SECTION DETAILS_rev.pdf421
document  VOLUME A.3.1_1174_TYPICAL SECTION DETAILS_rev.pdf368
document  VOLUME A.3.1_1175_TYPICAL SECTION DETAILS_rev.pdf402
document  VOLUME A.3.1_1180_SH1.pdf1102
document  VOLUME A.3.1_1181_SH2.pdf782
document  VOLUME A.3.1_1182_SH3.pdf838
document  VOLUME A.3.1_1183_SH4.pdf877
document  VOLUME A.3.1_1184_SH5.pdf920
document  VOLUME A.3.1_1185_SH6.pdf981
document  VOLUME A.3.1_1186_SH7.pdf853
document  VOLUME A.3.1_1187_REPLACEMENT_SHED_rev.pdf479
document  VOLUME A.3.1_1190_LANDSCAPING_rev.pdf1351
document  Works Requirements_SMH_MW.pdf403