Documents - Lot 164502:1 - Boyounagh Ballyedmond GWS Upgrade 2019
Document available to downloadSize (kB)
document  APPENDIX A.doc41
document  APPENDIX B1.doc74
document  Appendix B2_.doc49
document  APPENDIX B3.doc50
document  APPENDIX C2.doc45
document  APPENDIX C3.doc47
document  APPENDIX C4.doc47
document  APPENDIX D.doc34
document  APPENDIX E.doc45
document  APPENDIX F.doc42
document  APPENDIX G.doc34
document  APPENDIX H.doc35
document  Appointment PSCS.doc130
document  Boy_Ballyed 2018_51A 240419 A3L Section Ch 0 to 650m.pdf399
document  Boy_Ballyed 2018_51B 240419 A3L Section Ch 650 to 1300m.pdf426
document  Boy_Ballyed 2018_51C 240419 A3L Section Ch1300 to 1700m.pdf444
document  Boy_Ballyed 2018_51D 240419 A3L Section Ch 1700 to 1943m.pdf338
document  Boy_Ballyed 2019_1 Location of Boy_Ballyed gws supply Area 230419 A3P.pdf6848
document  Boy_Ballyed 2019_2 Connect Detail to Exist Pipe 230419 A3P.pdf118
document  Fittings Replacement Survey GGN_DMA2 23 04 2019.xls56
document  Fittings Replacement Survey GGN_DMA3 23 04 2019.xls62
document  Fittings Replacement Survey GGN_DMA4 23 04 2019.xls60
document  H&S Supplement 3.4.1.doc82
document  H&S Supplement 3.4.2.doc97
document  Instructions to Tenderers Boy_Ballyed Upgrade.docx97
document  Irish Water Standard Details rec 081118.pdf8287
document  Location of Fittings Boy+Bally DMA2 230419.pdf3857
document  Location of Fittings Boy+Bally DMA3 230419.pdf3735
document  Location of Fittings Boy+Bally DMA4 230419.pdf3725
document  Prelim H&S Plan Boy_Ballyed 040619.pdf134
document  Prelim Traffic Mgmt Plan Boy_Ballyed 230419.pdf89
document  Pricing Doc Vol C Part A Boyou_Ballyed.xls133
document  PW-CF5 Minor Building + C E Works.pdf611
document  QW2 Boyounagh Ballyedmond GWS.docx102
document  Standard Drgs of the TII Guidelines 120518.pdf20111
document  Tender Schedule Vol B Boy_Ballyed.docx92
document  Vol A Work Require Boy_Ballyed Upgrade.pdf380
Print...Close window