Instructions: Here are all documents for specified lot. Some documents are available to download without the need to logon.
| | Documents - Lot 158960:1 - Design, build, deploy and test a floating 60 Kw hydro-kinetic turbine platform that taps river flows to generate renewable electricity |
|
|