Documents - Lot 146628:1 - Ennis South Flood Relief Scheme
Document available to downloadSize (kB)
document  1_Cover_Book 3 of 6.pdf146
document  10_07 Civil_FW.pdf73
document  11_08 Civil_RF.pdf42
document  12_09 Civil_SW.pdf93
document  13_Civil_R.pdf77
document  14_Horizontal Directional Drilling Specification.pdf95
document  15 Civil_IL.pdf73
document  16 Civil_CCTV.pdf143
document  17_Civil_PL.pdf265
document  18_Civil_SS.pdf131
document  19_WIS 4-32-08 Issue 4.pdf893
document  2_Contents.pdf161
document  20_wis-4-32-16.pdf103
document  20180717-053_a_A0.pdf1766
document  20180717-053_B_A0.pdf1179
document  21_wis-4-32-19-v3.pdf184
document  2188 - Bord Pleanála Approval.pdf72
document  2188 - Bord Pleanála_Planning Documents.pdf50551
document  2188 Contents.pdf161
document  2188 Preliminary S&H Plan.pdf135
document  2188 SI Report Addendum.pdf16849
document  2188 SI Report Book 1.pdf49726
document  2188 SI Report Book 2.pdf31147
document  2188_E01C.pdf208
document  2188_E02C.pdf114
document  2188_E03C.pdf110
document  2188_E04D.pdf231
document  2188_E05C.pdf181
document  2188_E11D.pdf95
document  2188_Pricing Document Rev 3.0.pdf871
document  2188_TenderDrawings.pdf130613
document  2188_W02B.pdf270
document  2188_W03C.pdf88
document  2188_W04D.pdf95
document  2188_W05B.pdf112
document  2188_W06A.pdf107
document  2188_WR_Rev4.pdf1625
document  22_IGN 4-01-03_Issue 2 October 2015.pdf1551
document  23 wis-4-37-01.pdf101
document  24 wis-4-37-01-amendment-oct-1993.pdf20
document  25_DWI_Introduction.pdf59
document  26_DWI_List of Approved Products.pdf473
document  3_ PREAMBLE.pdf77
document  31 Requirements at River Sites ERFB.pdf871
document  32 Bord Gais Code of Practice 2015.pdf628
document  33_Recommendations for Site Dvelopment Works for Housing Areas.pdf1077
document  4_Civil_P RevA.pdf273
document  5_Civil_EW.pdf151
document  6_Civil_C.pdf172
document  7_04 Civil_SO.pdf60
document  8_05 Civil_SC.pdf64
document  9_06 Civil_W.pdf100
document  Annex_I_Schedule of Technical Particulars.pdf81
document  Annex_II_Quality Assurance.pdf90
document  Annex_III_Testing Procedures.pdf101
document  Annex_IV_Safety File.pdf99
document  Annex_IX_Schedule of Reinstatement.pdf83
document  Annex_V_Site Audit Form.pdf65
document  Annex_VI_Joint Record Sheet.pdf43
document  Annex_VII_Easements and Wayleaves.pdf34
document  Annex_VIII_Limitations on Working Hours.pdf32
document  Annex_X_Conditions-Road-Opening.pdf100
document  Annex_XI_Schedule of Service Crossings.pdf163
document  Annex_XII_Schedule of Culvert Routes.pdf60
document  Annex_XIII_Schedule of Embankment Setting Out.pdf97
document  Annex_XIV_Schedule of Rip-Rap.pdf152
document  Annex_XV_Ballybeg_Workstages_Map1of1.pdf43
document  Annex_XV_Flannans_Workstages_Map1of2.pdf63
document  Annex_XV_Flannans_Workstages_Map2of2.pdf52
document  Annex_XV_Sequencing and Mapping.pdf89
document  Annex_XVI_Conditions-Road-Closing.pdf29
document  Annex_XVII_Schedule of Perm&Temp Fencing.pdf101
document  Approved-material-suppliers-for-lv-mv-38kv-110kv-associated-works.pdf1063
document  C684 - Ennis South FRS - Archaeological Testing at Clareabbey - Draft 11-08-2016.pdf2516
document  Carriageway Chambers No 600.pdf133
document  CC-SCD-00706-03.pdf43
document  CLARECASTLES.dgn4945
document  CLARECASTLES.dwg6847
document  Code of Practice for Working in the Vicinity of the Transmission Network (2015).pdf742
document  DBYD_ Distribution Letter.doc173
document  DuctlineSpecifications.pdf2678
document  Easement and Wayleave Drawings.pdf1464
document  Electrical_Services_Guidebook.pdf5784
document  Ennis.pdf1232
document  ESB Construction Safety 28th 11.40.pdf804
document  ESB Construction Safety 28th 11.40.pdf804
document  Existing Services DWG S01&S02.pdf4259
document  Field_guide_to_invasive_species_in_Ireland_booklet.pdf4436
document  FL 1.pdf78
document  FL 2.pdf74
document  FL 3.pdf93
document  FTS-3-v2.3-06-06-2018.pdf196
document  GNI-DLE-4694.pdf969
document  GNI-DLE-4696.pdf882
document  GNI-DLE-4697.pdf966
document  I DEP-01211_Third Party Works_Additional Details of Railway.pdf390
document  Irish Rail_CCC_TMS_310_Guidance_on_third_party_works.pdf654
document  ITT-W2-v2.2-06-06-2018.pdf266
document  IW-CDS-5020-01_Standard-Details-Drawings-Water.pdf8287
document  IW-CDS-5020-02_Standard-Details-Designers-Assesment-of-Safety-Water.pdf2700
document  IW-CDS-5020-03_Code-of-Practice-for-Water-Supply.pdf2031
document  IW-CDS-5030-01_Standard-Details-Drawings-Wastewater.pdf9213
document  IW-CDS-5030-02_Standard-Details-Designers-Assesment-of-Safety-Wastewater.pdf2708
document  IW-CDS-5030-03_Code-of-Practice-for-Wastewater-Supply.pdf2439
document  japanese-knotweed.pdf85
document  Japanese-knotweed-BPM_-_Invasive_Species_Ireland-_updated-_-R_Muir_March_2016-6.pdf1714
document  kildysart rd.pdf63
document  Legislation-roi 1.pdf1121
document  legislation-roi 2.pdf14
document  LetterEnnis Regions OH HV.snp9
document  Limerick Rd, Ennis.pdf120
document  Management-of-Noxious-Weeds-and-Non-Native-Invasive-Plant-Species-on-National-Roa.pdf3752
document  MVLV_Duct_Summary.pdf7762
document  NRA_TII_CC-SPW-01200-03_Specifications for Road Works Series 1200 - Traffic Signs and Road Markings.pdf1362
document  NRA_TII_Good_Practice_Guidance_for_the_Treatment_of_Noise_during_the_Planning_of_National_R_S.pdf5439
document  NRA_TII_GUIDELINES_FOR_CROSSINGS_OF_WATER_COURSES.pdf1167
document  NRA_TII_Guidelines-for-the-Creation-and-Maintenance-of-an-Environmental-Operating-Plan.pdf3796
document  NRA_TII_Guidelines-for-the-Protection-and-Preservation-of-Trees-Hedgerows-and-Scrub.pdf292
document  NRA_TII_Notes for Guidance Series 600_March2013.pdf894
document  NRA_TII_Series 500_Drainage & Series Ducts_March2015.pdf1264
document  NRA_TII_Series 600_Earthworks_March2013.pdf1374
document  plot.log1
document  QW2_Appendix_A1.doc31
document  QW2_Appendix_A2.doc39
document  QW2_Appendix_B1.doc69
document  QW2_Appendix_B2.doc47
document  QW2_Appendix_B3.doc51
document  QW2_Appendix_C1.doc46
document  QW2_Appendix_C2.doc47
document  QW2_Appendix_C3.doc47
document  QW2_Appendix_C4.doc47
document  QW2_Appendix_C5.doc46
document  QW2_Appendix_C6.doc45
document  QW2_Appendix_H.doc33
document  QW2_Appendix_I.doc30
document  QW2_Appendix-D.docx16
document  QW2_Appendix-E.docx21
document  QW2_Appendix-F.docx20
document  QW2_Appendix-G.docx16
document  QW2_Suitability_Assessment_Open_Form.doc452
document  QW2_Supplement_3.4.1.doc86
document  QW2_Supplement_3.4.2.doc97
document  Ring Beams No 600 and 600A.pdf489
document  Safety advice for Working in the Vicinity of Natural Gas Pipelines A5.pdf1109
document  setting-your-priorities.pdf28
document  SIRO Ennis_Cluster 1_As-Built_13 July 2018.pdf1849
document  SIRO Ennis_Cluster 1B(Clarecastle)_As-Built_13 July 2018.pdf1064
document  SIRO Ennis_Cluster 2_As-Built_13 July 2018.pdf1525
document  SIRO Ennis_Cluster 3_As-Built_13 July 2018.pdf2017
document  St.Flannan's Signing and Lining Reinstatment.pdf786
document  Toberteascain, Ennis.pdf137
document  TRANSMISSION.pdf694
document  TSK-085681_1.pdf1391
document  TSK-085681_2.pdf612
document  TSK-085681_3.pdf540
document  TSK-085681_4.pdf420
document  Virgin Media As-built Work Areas.pdf3877
Print...Close window