Documents - Lot 102658:4 - Provision of 40 no. rapid delivery housing units at St Helena’s Drive, Finglas, Dublin.
Document available to downloadSize (kB)
document  2 Bed House - Room Data Sheets_Final.pdf80
document  2016-02-26_StHelnasGdns_IdicativeProgrammeRevision-D.pdf60
document  2016-03-02 _Employers Requirements_Final.pdf151
document  2016-03-02_Appendices to SAQ.pdf415
document  2016-03-07_Response 001.pdf8
document  2016-03-10_ExtensionOfTime.pdf24
document  2016-03-10_ProjectInfoSummary-131_Extended.pdf79
document  2016-03-10_QW1_Suitability_Assessment_Lot-4_Extended.doc510
document  2016-03-10_QW1_Suitability_Assessment_Lot-4_Extended.pdf271
document  3 Bed House - Room Data Sheets_Final.pdf90
document  Additional information to tenderers_Extended.pdf111
document  APPENDIX A PERSONAL SITUATION.doc40
document  APPENDIX A1.doc31
document  APPENDIX B1.doc63
document  APPENDIX B2 CERTIFICATE OF SATISFACTORY EXECUTION-WORKS ONLY.doc57
document  APPENDIX B3 CERTIFICATE OF SATISFACTORY DELIVERY OF SERVICES.doc58
document  APPENDIX C1 H&S DECLARATION CONTRATOR OR PSCS APPOINTMENTS.doc46
document  APPENDIX C2 H&S COMPLIANCE DECLARATION BY CONTRACTOR AS DESIGNER PSDP PSCS.doc46
document  APPENDIX C3 H&S COMPLAINCE DECLARATION CONTRACTOR SPECIALIST.doc46
document  APPENDIX C4 H&S COMPLIANCE DECLARATION PSCS.doc46
document  APPENDIX C5 H&S COMPLIANCE DECLARATION CONTRACTOR SPECIALIST AS DESIGNER.doc46
document  APPENDIX C6 H&S COMPLIANCE DECLARATION PSDP HSC.doc45
document  APPENDIX D DECLARATION ECONOMIC AND FINANCIAL CRITERIA.doc33
document  APPENDIX E DECLARATION TECHNICAL BODIES AND QUALITY CONTROL.doc42
document  APPENDIX F DECLARATION TECHNICAL EQUIPMENT.doc41
document  APPENDIX G DECLARATION H&S REF 3.4.1.A AND 3.4.1 B.doc32
document  APPENDIX H DECLARATION H&S REF 3.4.2.doc33
document  QW1_Supplement_3.4.1 H&S COMPETENCE OF THE CONTRACTOR.doc84
document  QW1_Supplement_3.4.2 H&S COMPETENCE OF THE CONTRACTOR AS PSCS.doc96
document  QW1_Supplement_3.4.3 H&S COMPETENCE OF THE CONTRACTOR AS DESIGNER.doc101
document  QW1_Supplement_3.4.4 H&S COMPETENCE OF THE CONTRACTOR AS PSDP.doc99
document  S3.4c Programme Supplement FINAL.doc38
document  SA3.4e Average Manpower Resources Chart FINAL.doc57
document  SchematicUnitLayouts.pdf271
document  SR3.4E RESOURCE SPREAD CHART TEMPLATE FINAL.xls51
document  St Helenas Schematic.pdf176
Print...Close window